{"id":483224,"date":"2023-07-24T12:09:07","date_gmt":"2023-07-24T11:09:07","guid":{"rendered":"https:\/\/www.constructionnews.co.uk\/?p=483224"},"modified":"2023-07-24T14:28:54","modified_gmt":"2023-07-24T13:28:54","slug":"margin-squeezed-at-sir-robert-mcalpine","status":"publish","type":"post","link":"https:\/\/www.constructionnews.co.uk\/contractors\/sir-robert-mcalpine\/margin-squeezed-at-sir-robert-mcalpine-24-07-2023\/","title":{"rendered":"Margin squeezed at Sir Robert McAlpine"},"content":{"rendered":"<p>Sir Robert McAlpine saw its profit margin squeezed to 0.86 per cent last year, although a hefty increase in revenue kept its profit stable.<\/p>\n<p><span style=\"font-weight: 400;\">The family-owned contractor turned over \u00a31.07bn in the year to 31 October 2022, an increase of \u00a3150m \u2013 or 16 per cent \u2013 on its previous year. However, its pre-tax profit increased by just \u00a3150,000, to \u00a39.3m. In its previous financial year, Sir Robert McAlpine had a profit margin of 0.98 per cent.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The company put aside \u00a320m in provisions, with \u00a38.8m relating to remedial work on completed contracts and \u00a311m relating to loss-making jobs. Of the provisions, \u00a32.8m was a restatement of a portion of the \u00a324m remedial provisions made by the group last year.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Sir Robert McAlpine\u2019s cash decreased slightly, from \u00a3106m to \u00a3100m, but the company said it had \u201cno debt other than a nominal level of financial leases\u201d. It spent \u00a33.2m on directors\u2019 remuneration last year (up from \u00a32.8m), with the best-paid director receiving \u00a3841,000 (up from \u00a3765,000).<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In the results, Sir Robert McAlpine chief financial officer Leighton More said: \u201cTh[e] recovery in activity levels post the global pandemic was tempered by subsequent supply chain, labour-availability and inflationary pressures. The challenges in the trading environment were further exacerbated by events that unfolded in Ukraine in February 2022.\u201d<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In April, the contractor cut about 40 jobs as it restructured its business around sectors rather than regions. More said the \u201cadaptation and streamlining\u201d of its model would save \u00a320m per year once complete in 12 to 18 months\u2019 time.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u201cA lower cost base will allow us to navigate the ongoing challenging economic environment, as well as to maximise operating margins, as the global economy recovers from the inflation- and energy-price shock that has impacted the last 12 months,\u201d he added.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Paul Hamer, chief executive of Sir Robert McAlpine (SRM), said: \u201cWe have once again had to face unprecedented challenges as an industry.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u201cRecently, we took our next strategic step, evolving SRM for future generations and setting up the business for long-term success,\u201d he said. \u201cAs a result, we have transitioned to a national sector-focused operating model, with centres of excellence that will provide swift, expert support to our projects, creating more value for our clients.\u201d<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Sir Robert McAlpine saw its profit margin squeezed to 0.86 per cent last year, although a hefty increase in revenue kept its profit stable. The family-owned contractor turned over \u00a31.07bn in the year to 31 October 2022, an increase of \u00a3150m \u2013 or 16 per cent \u2013 on its previous year. However, its pre-tax profit &#8230;<\/p>\n","protected":false},"author":90383,"featured_media":483231,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ep_exclude_from_search":false,"footnotes":""},"categories":[552,542],"tags":[],"class_list":["post-483224","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-financial","category-sir-robert-mcalpine"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.7 (Yoast SEO v26.7) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Margin squeezed at Sir Robert McAlpine | Construction News<\/title>\n<meta name=\"description\" content=\"Sir Robert McAlpine saw its profit margin squeezed to 0.86 per cent last year, although a hefty increase in revenue kept its profit stable. The\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionnews.co.uk\/contractors\/sir-robert-mcalpine\/margin-squeezed-at-sir-robert-mcalpine-24-07-2023\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Margin squeezed at Sir Robert McAlpine\" \/>\n<meta property=\"og:description\" content=\"Sir Robert McAlpine saw its profit margin squeezed to 0.86 per cent last year, although a hefty increase in revenue kept its profit stable. The\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionnews.co.uk\/contractors\/sir-robert-mcalpine\/margin-squeezed-at-sir-robert-mcalpine-24-07-2023\/\" \/>\n<meta property=\"og:site_name\" content=\"Construction News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/CN.community\" \/>\n<meta property=\"article:published_time\" content=\"2023-07-24T11:09:07+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-07-24T13:28:54+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2023\/07\/The-Elizabeth-Tower-restored.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"620\" \/>\n\t<meta property=\"og:image:height\" content=\"414\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Will Ing\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@CNplus\" \/>\n<meta name=\"twitter:site\" content=\"@CNplus\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Will Ing\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/contractors\/sir-robert-mcalpine\/margin-squeezed-at-sir-robert-mcalpine-24-07-2023\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/contractors\/sir-robert-mcalpine\/margin-squeezed-at-sir-robert-mcalpine-24-07-2023\/\"},\"author\":{\"name\":\"Will Ing\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/ff165fb2264f17ba8b942d867cb65f37\"},\"headline\":\"Margin squeezed at Sir Robert McAlpine\",\"datePublished\":\"2023-07-24T11:09:07+00:00\",\"dateModified\":\"2023-07-24T13:28:54+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/contractors\/sir-robert-mcalpine\/margin-squeezed-at-sir-robert-mcalpine-24-07-2023\/\"},\"wordCount\":364,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/contractors\/sir-robert-mcalpine\/margin-squeezed-at-sir-robert-mcalpine-24-07-2023\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2023\/07\/The-Elizabeth-Tower-restored.jpg\",\"articleSection\":[\"Financial\",\"Sir Robert McAlpine\"],\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.constructionnews.co.uk\/contractors\/sir-robert-mcalpine\/margin-squeezed-at-sir-robert-mcalpine-24-07-2023\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/contractors\/sir-robert-mcalpine\/margin-squeezed-at-sir-robert-mcalpine-24-07-2023\/\",\"url\":\"https:\/\/www.constructionnews.co.uk\/contractors\/sir-robert-mcalpine\/margin-squeezed-at-sir-robert-mcalpine-24-07-2023\/\",\"name\":\"Margin squeezed at Sir Robert McAlpine | Construction News\",\"isPartOf\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/contractors\/sir-robert-mcalpine\/margin-squeezed-at-sir-robert-mcalpine-24-07-2023\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/contractors\/sir-robert-mcalpine\/margin-squeezed-at-sir-robert-mcalpine-24-07-2023\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2023\/07\/The-Elizabeth-Tower-restored.jpg\",\"datePublished\":\"2023-07-24T11:09:07+00:00\",\"dateModified\":\"2023-07-24T13:28:54+00:00\",\"author\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/ff165fb2264f17ba8b942d867cb65f37\"},\"description\":\"Sir Robert McAlpine saw its profit margin squeezed to 0.86 per cent last year, although a hefty increase in revenue kept its profit stable. The\",\"breadcrumb\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/contractors\/sir-robert-mcalpine\/margin-squeezed-at-sir-robert-mcalpine-24-07-2023\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.constructionnews.co.uk\/contractors\/sir-robert-mcalpine\/margin-squeezed-at-sir-robert-mcalpine-24-07-2023\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/contractors\/sir-robert-mcalpine\/margin-squeezed-at-sir-robert-mcalpine-24-07-2023\/#primaryimage\",\"url\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2023\/07\/The-Elizabeth-Tower-restored.jpg\",\"contentUrl\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2023\/07\/The-Elizabeth-Tower-restored.jpg\",\"width\":1024,\"height\":683,\"caption\":\"Sir Robert McAlpine finished work on refurbishing the Elizabeth Tower during its latest financial year\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/contractors\/sir-robert-mcalpine\/margin-squeezed-at-sir-robert-mcalpine-24-07-2023\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.constructionnews.co.uk\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Margin squeezed at Sir Robert McAlpine\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#website\",\"url\":\"https:\/\/www.constructionnews.co.uk\/\",\"name\":\"Construction News\",\"description\":\"Read UK Construction Industry News, Analysis, Opinion and data\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.constructionnews.co.uk\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/ff165fb2264f17ba8b942d867cb65f37\",\"name\":\"Will Ing\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/image\/f209e1184bae15c4878a1c08ad6e7407\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/c3c246ab3a76bd45440a22b73e591d80b7bcad4d1c1999e73c22c544e3cd01d1?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/c3c246ab3a76bd45440a22b73e591d80b7bcad4d1c1999e73c22c544e3cd01d1?s=96&d=mm&r=g\",\"caption\":\"Will Ing\"},\"url\":\"https:\/\/www.constructionnews.co.uk\/author\/will-ing-2\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Margin squeezed at Sir Robert McAlpine | Construction News","description":"Sir Robert McAlpine saw its profit margin squeezed to 0.86 per cent last year, although a hefty increase in revenue kept its profit stable. The","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionnews.co.uk\/contractors\/sir-robert-mcalpine\/margin-squeezed-at-sir-robert-mcalpine-24-07-2023\/","og_locale":"en_GB","og_type":"article","og_title":"Margin squeezed at Sir Robert McAlpine","og_description":"Sir Robert McAlpine saw its profit margin squeezed to 0.86 per cent last year, although a hefty increase in revenue kept its profit stable. The","og_url":"https:\/\/www.constructionnews.co.uk\/contractors\/sir-robert-mcalpine\/margin-squeezed-at-sir-robert-mcalpine-24-07-2023\/","og_site_name":"Construction News","article_publisher":"https:\/\/www.facebook.com\/CN.community","article_published_time":"2023-07-24T11:09:07+00:00","article_modified_time":"2023-07-24T13:28:54+00:00","og_image":[{"url":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2023\/07\/The-Elizabeth-Tower-restored.jpg","width":620,"height":414,"type":"image\/jpeg"}],"author":"Will Ing","twitter_card":"summary_large_image","twitter_creator":"@CNplus","twitter_site":"@CNplus","twitter_misc":{"Written by":"Will Ing","Estimated reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionnews.co.uk\/contractors\/sir-robert-mcalpine\/margin-squeezed-at-sir-robert-mcalpine-24-07-2023\/#article","isPartOf":{"@id":"https:\/\/www.constructionnews.co.uk\/contractors\/sir-robert-mcalpine\/margin-squeezed-at-sir-robert-mcalpine-24-07-2023\/"},"author":{"name":"Will Ing","@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/ff165fb2264f17ba8b942d867cb65f37"},"headline":"Margin squeezed at Sir Robert McAlpine","datePublished":"2023-07-24T11:09:07+00:00","dateModified":"2023-07-24T13:28:54+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionnews.co.uk\/contractors\/sir-robert-mcalpine\/margin-squeezed-at-sir-robert-mcalpine-24-07-2023\/"},"wordCount":364,"commentCount":0,"image":{"@id":"https:\/\/www.constructionnews.co.uk\/contractors\/sir-robert-mcalpine\/margin-squeezed-at-sir-robert-mcalpine-24-07-2023\/#primaryimage"},"thumbnailUrl":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2023\/07\/The-Elizabeth-Tower-restored.jpg","articleSection":["Financial","Sir Robert McAlpine"],"inLanguage":"en-GB","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionnews.co.uk\/contractors\/sir-robert-mcalpine\/margin-squeezed-at-sir-robert-mcalpine-24-07-2023\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionnews.co.uk\/contractors\/sir-robert-mcalpine\/margin-squeezed-at-sir-robert-mcalpine-24-07-2023\/","url":"https:\/\/www.constructionnews.co.uk\/contractors\/sir-robert-mcalpine\/margin-squeezed-at-sir-robert-mcalpine-24-07-2023\/","name":"Margin squeezed at Sir Robert McAlpine | Construction News","isPartOf":{"@id":"https:\/\/www.constructionnews.co.uk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionnews.co.uk\/contractors\/sir-robert-mcalpine\/margin-squeezed-at-sir-robert-mcalpine-24-07-2023\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionnews.co.uk\/contractors\/sir-robert-mcalpine\/margin-squeezed-at-sir-robert-mcalpine-24-07-2023\/#primaryimage"},"thumbnailUrl":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2023\/07\/The-Elizabeth-Tower-restored.jpg","datePublished":"2023-07-24T11:09:07+00:00","dateModified":"2023-07-24T13:28:54+00:00","author":{"@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/ff165fb2264f17ba8b942d867cb65f37"},"description":"Sir Robert McAlpine saw its profit margin squeezed to 0.86 per cent last year, although a hefty increase in revenue kept its profit stable. The","breadcrumb":{"@id":"https:\/\/www.constructionnews.co.uk\/contractors\/sir-robert-mcalpine\/margin-squeezed-at-sir-robert-mcalpine-24-07-2023\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionnews.co.uk\/contractors\/sir-robert-mcalpine\/margin-squeezed-at-sir-robert-mcalpine-24-07-2023\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.constructionnews.co.uk\/contractors\/sir-robert-mcalpine\/margin-squeezed-at-sir-robert-mcalpine-24-07-2023\/#primaryimage","url":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2023\/07\/The-Elizabeth-Tower-restored.jpg","contentUrl":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2023\/07\/The-Elizabeth-Tower-restored.jpg","width":1024,"height":683,"caption":"Sir Robert McAlpine finished work on refurbishing the Elizabeth Tower during its latest financial year"},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionnews.co.uk\/contractors\/sir-robert-mcalpine\/margin-squeezed-at-sir-robert-mcalpine-24-07-2023\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionnews.co.uk\/"},{"@type":"ListItem","position":2,"name":"Margin squeezed at Sir Robert McAlpine"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionnews.co.uk\/#website","url":"https:\/\/www.constructionnews.co.uk\/","name":"Construction News","description":"Read UK Construction Industry News, Analysis, Opinion and data","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionnews.co.uk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/ff165fb2264f17ba8b942d867cb65f37","name":"Will Ing","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/image\/f209e1184bae15c4878a1c08ad6e7407","url":"https:\/\/secure.gravatar.com\/avatar\/c3c246ab3a76bd45440a22b73e591d80b7bcad4d1c1999e73c22c544e3cd01d1?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c3c246ab3a76bd45440a22b73e591d80b7bcad4d1c1999e73c22c544e3cd01d1?s=96&d=mm&r=g","caption":"Will Ing"},"url":"https:\/\/www.constructionnews.co.uk\/author\/will-ing-2\/"}]}},"_links":{"self":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/483224","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/users\/90383"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/comments?post=483224"}],"version-history":[{"count":9,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/483224\/revisions"}],"predecessor-version":[{"id":483252,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/483224\/revisions\/483252"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/media\/483231"}],"wp:attachment":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/media?parent=483224"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/categories?post=483224"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/tags?post=483224"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}