{"id":520737,"date":"2025-05-19T12:45:30","date_gmt":"2025-05-19T11:45:30","guid":{"rendered":"https:\/\/www.constructionnews.co.uk\/?p=520737"},"modified":"2025-05-16T16:56:32","modified_gmt":"2025-05-16T15:56:32","slug":"stanmore-launches-integrated-design-service-to-combat-bsr-backlogs","status":"publish","type":"post","link":"https:\/\/www.constructionnews.co.uk\/consultants\/stanmore-launches-integrated-design-service-to-combat-bsr-backlogs-19-05-2025\/","title":{"rendered":"Stanmore launches service to combat BSR backlogs"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">Envelope contractor Stanmore has launched an integrated design, procurement and construction service to tackle bottlenecks under the new building safety regime.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">It said the move would make it less likely that applications had to be resubmitted to the Building Safety Regulator in the wake of late-stage design changes, which have been causing delays.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Projects would be better prepared for gateway two submission if technical design consultancy, procurement services and contractor-led advice could be accessed in a single place, Stanmore said.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Under the regulator\u2019s post-Grenfell regime, developers are required to undergo three gateway stages to gain sign-off for residential developments taller than 18 metres.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">However, there have been widespread calls for a review of gateway two after a backlog of applications built up, causing high-rise development to virtually grind to a halt.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Last week, building safety minister Alex Norris<\/span><a href=\"https:\/\/www.constructionnews.co.uk\/government\/minister-meets-developers-to-find-ways-to-speed-up-bsr-applications-09-05-2025\/\"> <span style=\"font-weight: 400;\">acknowledged that delays to high-rise projects were being caused by difficulties in processing applications<\/span><\/a><span style=\"font-weight: 400;\"> and promised to explore \u201call possible options\u201d to get the regulator up to speed.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Stanmore managing director Raj Manak said that under the new regulatory framework, it was vital to integrate procurement and construction insight into the technical design stage as early as possible.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u201cOur ultimate aim is to make technical design seamless, efficient and effective,\u201d he said.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u201cWe want to reduce risk, save costs, and deliver solutions that work in practice and not just in theory.\u201d<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Under the new division, Stanmore Design House, clients will have access to RIBA technical design services at stage four and onwards, including elevation drawings, section and plan details, subframe layouts, wind-load assessments and thermal analysis.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u201cStanmore will also apply its contractor expertise to the design process, ensuring all technical designs are practical and buildable,\u201d the company said.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The technical designs service will sit alongside procurement and construction support, including the assessment of material availability, quality assurance through early factory visits, and consideration of site logistics.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u201cThis end-to-end support will help minimise the risk of late-stage design changes that could trigger BSR resubmission and cause delays,\u201d it said.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u201cThe offering is designed to streamline planning, reduce risk and ensure designs are ready for real-world construction.\u201d<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Starting out as a drylining and plastering firm in 1958, Stanmore has since become one of the UK\u2019s highest-earning envelope contractors, providing installation and design services across facade types, including brickwork, glazing, metalwork and modular.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In 2024, it<\/span><a href=\"https:\/\/www.constructionnews.co.uk\/financial\/cn-specialists-index-2024-top-10-envelope-contractors-10-12-2024\/\"> <span style=\"font-weight: 400;\">headed the CN Specialists Index for envelope contractors<\/span><\/a><span style=\"font-weight: 400;\"> for the second year running.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Envelope contractor Stanmore has launched an integrated design, procurement and construction service to tackle bottlenecks under the new building safety regime. It said the move would make it less likely that applications had to be resubmitted to the Building Safety Regulator in the wake of late-stage design changes, which have been causing delays. Projects would &#8230;<\/p>\n","protected":false},"author":130832,"featured_media":520736,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ep_exclude_from_search":false,"footnotes":""},"categories":[79552,57172],"tags":[],"class_list":["post-520737","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-building-safety","category-consultants"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.7 (Yoast SEO v26.7) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Stanmore launches service to combat BSR backlogs | Construction News<\/title>\n<meta name=\"description\" content=\"Envelope contractor Stanmore has launched an integrated design, procurement and construction service to tackle bottlenecks under the new building safety\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionnews.co.uk\/consultants\/stanmore-launches-integrated-design-service-to-combat-bsr-backlogs-19-05-2025\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Stanmore launches service to combat BSR backlogs\" \/>\n<meta property=\"og:description\" content=\"Envelope contractor Stanmore has launched an integrated design, procurement and construction service to tackle bottlenecks under the new building safety\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionnews.co.uk\/consultants\/stanmore-launches-integrated-design-service-to-combat-bsr-backlogs-19-05-2025\/\" \/>\n<meta property=\"og:site_name\" content=\"Construction News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/CN.community\" \/>\n<meta property=\"article:published_time\" content=\"2025-05-19T11:45:30+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2025\/05\/Stanmore-Design-House.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"620\" \/>\n\t<meta property=\"og:image:height\" content=\"414\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"Kerry Lorimer\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@CNplus\" \/>\n<meta name=\"twitter:site\" content=\"@CNplus\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Kerry Lorimer\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/consultants\/stanmore-launches-integrated-design-service-to-combat-bsr-backlogs-19-05-2025\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/consultants\/stanmore-launches-integrated-design-service-to-combat-bsr-backlogs-19-05-2025\/\"},\"author\":{\"name\":\"Kerry Lorimer\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/a384354d3d34f0aa0de2fb86f6bc0ed4\"},\"headline\":\"Stanmore launches service to combat BSR backlogs\",\"datePublished\":\"2025-05-19T11:45:30+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/consultants\/stanmore-launches-integrated-design-service-to-combat-bsr-backlogs-19-05-2025\/\"},\"wordCount\":410,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/consultants\/stanmore-launches-integrated-design-service-to-combat-bsr-backlogs-19-05-2025\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2025\/05\/Stanmore-Design-House.webp\",\"articleSection\":[\"Building safety\",\"Consultants\"],\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.constructionnews.co.uk\/consultants\/stanmore-launches-integrated-design-service-to-combat-bsr-backlogs-19-05-2025\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/consultants\/stanmore-launches-integrated-design-service-to-combat-bsr-backlogs-19-05-2025\/\",\"url\":\"https:\/\/www.constructionnews.co.uk\/consultants\/stanmore-launches-integrated-design-service-to-combat-bsr-backlogs-19-05-2025\/\",\"name\":\"Stanmore launches service to combat BSR backlogs | Construction News\",\"isPartOf\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/consultants\/stanmore-launches-integrated-design-service-to-combat-bsr-backlogs-19-05-2025\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/consultants\/stanmore-launches-integrated-design-service-to-combat-bsr-backlogs-19-05-2025\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2025\/05\/Stanmore-Design-House.webp\",\"datePublished\":\"2025-05-19T11:45:30+00:00\",\"author\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/a384354d3d34f0aa0de2fb86f6bc0ed4\"},\"description\":\"Envelope contractor Stanmore has launched an integrated design, procurement and construction service to tackle bottlenecks under the new building safety\",\"breadcrumb\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/consultants\/stanmore-launches-integrated-design-service-to-combat-bsr-backlogs-19-05-2025\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.constructionnews.co.uk\/consultants\/stanmore-launches-integrated-design-service-to-combat-bsr-backlogs-19-05-2025\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/consultants\/stanmore-launches-integrated-design-service-to-combat-bsr-backlogs-19-05-2025\/#primaryimage\",\"url\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2025\/05\/Stanmore-Design-House.webp\",\"contentUrl\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2025\/05\/Stanmore-Design-House.webp\",\"width\":1024,\"height\":683,\"caption\":\"The new Stanmore Design House team\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/consultants\/stanmore-launches-integrated-design-service-to-combat-bsr-backlogs-19-05-2025\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.constructionnews.co.uk\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Stanmore launches service to combat BSR backlogs\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#website\",\"url\":\"https:\/\/www.constructionnews.co.uk\/\",\"name\":\"Construction News\",\"description\":\"Read UK Construction Industry News, Analysis, Opinion and data\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.constructionnews.co.uk\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/a384354d3d34f0aa0de2fb86f6bc0ed4\",\"name\":\"Kerry Lorimer\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/image\/9b1e4c651fa120500e6c46317ec96304\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/b104d57d08308ec17931700ba6d00bd7830a2b17ac02aee353678d56a7af2ad1?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/b104d57d08308ec17931700ba6d00bd7830a2b17ac02aee353678d56a7af2ad1?s=96&d=mm&r=g\",\"caption\":\"Kerry Lorimer\"},\"url\":\"https:\/\/www.constructionnews.co.uk\/author\/kerry-lorimer\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Stanmore launches service to combat BSR backlogs | Construction News","description":"Envelope contractor Stanmore has launched an integrated design, procurement and construction service to tackle bottlenecks under the new building safety","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionnews.co.uk\/consultants\/stanmore-launches-integrated-design-service-to-combat-bsr-backlogs-19-05-2025\/","og_locale":"en_GB","og_type":"article","og_title":"Stanmore launches service to combat BSR backlogs","og_description":"Envelope contractor Stanmore has launched an integrated design, procurement and construction service to tackle bottlenecks under the new building safety","og_url":"https:\/\/www.constructionnews.co.uk\/consultants\/stanmore-launches-integrated-design-service-to-combat-bsr-backlogs-19-05-2025\/","og_site_name":"Construction News","article_publisher":"https:\/\/www.facebook.com\/CN.community","article_published_time":"2025-05-19T11:45:30+00:00","og_image":[{"url":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2025\/05\/Stanmore-Design-House.webp","width":620,"height":414,"type":"image\/webp"}],"author":"Kerry Lorimer","twitter_card":"summary_large_image","twitter_creator":"@CNplus","twitter_site":"@CNplus","twitter_misc":{"Written by":"Kerry Lorimer","Estimated reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionnews.co.uk\/consultants\/stanmore-launches-integrated-design-service-to-combat-bsr-backlogs-19-05-2025\/#article","isPartOf":{"@id":"https:\/\/www.constructionnews.co.uk\/consultants\/stanmore-launches-integrated-design-service-to-combat-bsr-backlogs-19-05-2025\/"},"author":{"name":"Kerry Lorimer","@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/a384354d3d34f0aa0de2fb86f6bc0ed4"},"headline":"Stanmore launches service to combat BSR backlogs","datePublished":"2025-05-19T11:45:30+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionnews.co.uk\/consultants\/stanmore-launches-integrated-design-service-to-combat-bsr-backlogs-19-05-2025\/"},"wordCount":410,"commentCount":0,"image":{"@id":"https:\/\/www.constructionnews.co.uk\/consultants\/stanmore-launches-integrated-design-service-to-combat-bsr-backlogs-19-05-2025\/#primaryimage"},"thumbnailUrl":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2025\/05\/Stanmore-Design-House.webp","articleSection":["Building safety","Consultants"],"inLanguage":"en-GB","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionnews.co.uk\/consultants\/stanmore-launches-integrated-design-service-to-combat-bsr-backlogs-19-05-2025\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionnews.co.uk\/consultants\/stanmore-launches-integrated-design-service-to-combat-bsr-backlogs-19-05-2025\/","url":"https:\/\/www.constructionnews.co.uk\/consultants\/stanmore-launches-integrated-design-service-to-combat-bsr-backlogs-19-05-2025\/","name":"Stanmore launches service to combat BSR backlogs | Construction News","isPartOf":{"@id":"https:\/\/www.constructionnews.co.uk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionnews.co.uk\/consultants\/stanmore-launches-integrated-design-service-to-combat-bsr-backlogs-19-05-2025\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionnews.co.uk\/consultants\/stanmore-launches-integrated-design-service-to-combat-bsr-backlogs-19-05-2025\/#primaryimage"},"thumbnailUrl":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2025\/05\/Stanmore-Design-House.webp","datePublished":"2025-05-19T11:45:30+00:00","author":{"@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/a384354d3d34f0aa0de2fb86f6bc0ed4"},"description":"Envelope contractor Stanmore has launched an integrated design, procurement and construction service to tackle bottlenecks under the new building safety","breadcrumb":{"@id":"https:\/\/www.constructionnews.co.uk\/consultants\/stanmore-launches-integrated-design-service-to-combat-bsr-backlogs-19-05-2025\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionnews.co.uk\/consultants\/stanmore-launches-integrated-design-service-to-combat-bsr-backlogs-19-05-2025\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.constructionnews.co.uk\/consultants\/stanmore-launches-integrated-design-service-to-combat-bsr-backlogs-19-05-2025\/#primaryimage","url":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2025\/05\/Stanmore-Design-House.webp","contentUrl":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2025\/05\/Stanmore-Design-House.webp","width":1024,"height":683,"caption":"The new Stanmore Design House team"},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionnews.co.uk\/consultants\/stanmore-launches-integrated-design-service-to-combat-bsr-backlogs-19-05-2025\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionnews.co.uk\/"},{"@type":"ListItem","position":2,"name":"Stanmore launches service to combat BSR backlogs"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionnews.co.uk\/#website","url":"https:\/\/www.constructionnews.co.uk\/","name":"Construction News","description":"Read UK Construction Industry News, Analysis, Opinion and data","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionnews.co.uk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/a384354d3d34f0aa0de2fb86f6bc0ed4","name":"Kerry Lorimer","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/image\/9b1e4c651fa120500e6c46317ec96304","url":"https:\/\/secure.gravatar.com\/avatar\/b104d57d08308ec17931700ba6d00bd7830a2b17ac02aee353678d56a7af2ad1?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b104d57d08308ec17931700ba6d00bd7830a2b17ac02aee353678d56a7af2ad1?s=96&d=mm&r=g","caption":"Kerry Lorimer"},"url":"https:\/\/www.constructionnews.co.uk\/author\/kerry-lorimer\/"}]}},"_links":{"self":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/520737","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/users\/130832"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/comments?post=520737"}],"version-history":[{"count":9,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/520737\/revisions"}],"predecessor-version":[{"id":520949,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/520737\/revisions\/520949"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/media\/520736"}],"wp:attachment":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/media?parent=520737"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/categories?post=520737"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/tags?post=520737"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}