{"id":529193,"date":"2025-09-23T12:45:36","date_gmt":"2025-09-23T11:45:36","guid":{"rendered":"https:\/\/www.constructionnews.co.uk\/?p=529193"},"modified":"2025-09-23T11:00:30","modified_gmt":"2025-09-23T10:00:30","slug":"leaks-delay-bams-36m-passivhaus-leisure-centre","status":"publish","type":"post","link":"https:\/\/www.constructionnews.co.uk\/contractors\/bam-construct\/leaks-delay-bams-36m-passivhaus-leisure-centre-23-09-2025\/","title":{"rendered":"Leaks delay Bam\u2019s \u00a336m Passivhaus leisure centre"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">Water ingress has caused a 34-week delay to the \u00a336m build of a Passivhaus-standard leisure centre in Scotland.<\/span><\/p>\n<p><a href=\"https:\/\/www.constructionnews.co.uk\/contractors\/bam-construct\/\"><span style=\"font-weight: 400;\">Bam Construct<\/span><\/a><span style=\"font-weight: 400;\"> had expected to finish construction work at Blairgowrie Recreation Centre by 16 December last year, but the contractor only handed over to the local council on 11 August, after water seepage was found in the building on multiple occasions.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The project cost is also set to rise, as the delay forced back the second part of the project by more than eight months, according to a report submitted to Perth and Kinross Council\u2019s scrutiny and performance committee last week. <\/span><span style=\"font-weight: 400;\">The report does not specify what that impact on cost will be.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Bam started work on site in May 2023 to build a multisports facility with a 25-metre swimming pool, sports halls, fitness suite and dance studio. Designed to replace Blair Recreation Centre, the building also includes a PE classroom and offices.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Blairgowrie Recreation Centre is only the second UK leisure centre with a swimming pool to be built to Passivhaus standard, according to the report, seen by <\/span><i><span style=\"font-weight: 400;\">Construction News<\/span><\/i><span style=\"font-weight: 400;\">.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The project encountered \u201cmultiple technical challenges during the final construction phase\u201d, according to the report&#8217;s authors: the council\u2019s strategic lead for property services, Stephen Crawford; and Robert Meiklejohn, a project manager and architect employed by the council.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The issues \u2013 which were located at the swimming pool \u2013 required \u201cextensive testing [and] targeted repairs\u201d, they said.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Bam first discovered water ingress in the building\u2019s technical and plant room last November. Inspections revealed it was caused by a \u201csignificant\u201d liner tear from a loose boom panel and three pin-sized holes of unknown origin in the liner.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The liner tear and holes were fixed, but the council&#8217;s report described flooding in January this year following a pump failure in the plant room, as well as further leaks the following month.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Bam faced more problems when it identified pipework on one side of the pool that did not hold pressure.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The pipes \u2013 which the report said had passed pressure tests during construction \u2013 were fixed after an excavation found a fractured elbow joint and a failed seal near the pool\u2019s shallow end.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">By July, the pool was deemed stable, although residual seepage from earlier leaks continued into the technical room.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The council\u2019s report stresses that while the facility is now open and operational, \u201csmall amounts of residual water\u201d are still being monitored.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Bam<\/span><a href=\"https:\/\/www.constructionnews.co.uk\/contractors\/bam-construct\/bam-sorry-for-delayed-scottish-leisure-centre-29-04-2025\/\"> <span style=\"font-weight: 400;\">apologised for the problems in April<\/span><\/a><span style=\"font-weight: 400;\">, and the latest report says a decision has been made to delay the second stage of the job \u2013 the demolition of Blair Recreation Centre \u2013 by six months, in case the seepage is \u201csymptomatic of an ongoing defect\u201d.<\/span><\/p>\n<p><i><span style=\"font-weight: 400;\">CN <\/span><\/i><span style=\"font-weight: 400;\">contacted Perth and Kinross Council for comment. A spokesperson for Bam Construct passed <\/span><i><span style=\"font-weight: 400;\">CN\u2019<\/span><\/i><span style=\"font-weight: 400;\">s request for comment to the council.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Water ingress has caused a 34-week delay to the \u00a336m build of a Passivhaus-standard leisure centre in Scotland. Bam Construct had expected to finish construction work at Blairgowrie Recreation Centre by 16 December last year, but the contractor only handed over to the local council on 11 August, after water seepage was found in the &#8230;<\/p>\n","protected":false},"author":90643,"featured_media":529202,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ep_exclude_from_search":false,"footnotes":""},"categories":[547,528],"tags":[],"class_list":["post-529193","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-buildings","category-bam-construct","issue-online-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.7 (Yoast SEO v26.7) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Leaks delay Bam\u2019s \u00a336m Passivhaus leisure centre | Construction News<\/title>\n<meta name=\"description\" content=\"Water ingress has caused a 34-week delay to the \u00a336m build of a Passivhaus-standard leisure centre in Scotland. Bam Construct had expected to finish\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionnews.co.uk\/contractors\/bam-construct\/leaks-delay-bams-36m-passivhaus-leisure-centre-23-09-2025\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Leaks delay Bam\u2019s \u00a336m Passivhaus leisure centre\" \/>\n<meta property=\"og:description\" content=\"Water ingress has caused a 34-week delay to the \u00a336m build of a Passivhaus-standard leisure centre in Scotland. Bam Construct had expected to finish\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionnews.co.uk\/contractors\/bam-construct\/leaks-delay-bams-36m-passivhaus-leisure-centre-23-09-2025\/\" \/>\n<meta property=\"og:site_name\" content=\"Construction News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/CN.community\" \/>\n<meta property=\"article:published_time\" content=\"2025-09-23T11:45:36+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2025\/09\/blairgowrie-swimming-pool.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"620\" \/>\n\t<meta property=\"og:image:height\" content=\"414\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"Joshua Stein\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@CNplus\" \/>\n<meta name=\"twitter:site\" content=\"@CNplus\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Joshua Stein\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/contractors\/bam-construct\/leaks-delay-bams-36m-passivhaus-leisure-centre-23-09-2025\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/contractors\/bam-construct\/leaks-delay-bams-36m-passivhaus-leisure-centre-23-09-2025\/\"},\"author\":{\"name\":\"Joshua Stein\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/482eae6a8521cf09396402a7e955effc\"},\"headline\":\"Leaks delay Bam\u2019s \u00a336m Passivhaus leisure centre\",\"datePublished\":\"2025-09-23T11:45:36+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/contractors\/bam-construct\/leaks-delay-bams-36m-passivhaus-leisure-centre-23-09-2025\/\"},\"wordCount\":473,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/contractors\/bam-construct\/leaks-delay-bams-36m-passivhaus-leisure-centre-23-09-2025\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2025\/09\/blairgowrie-swimming-pool.webp\",\"articleSection\":[\"Buildings\",\"Royal Bam\"],\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.constructionnews.co.uk\/contractors\/bam-construct\/leaks-delay-bams-36m-passivhaus-leisure-centre-23-09-2025\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/contractors\/bam-construct\/leaks-delay-bams-36m-passivhaus-leisure-centre-23-09-2025\/\",\"url\":\"https:\/\/www.constructionnews.co.uk\/contractors\/bam-construct\/leaks-delay-bams-36m-passivhaus-leisure-centre-23-09-2025\/\",\"name\":\"Leaks delay Bam\u2019s \u00a336m Passivhaus leisure centre | Construction News\",\"isPartOf\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/contractors\/bam-construct\/leaks-delay-bams-36m-passivhaus-leisure-centre-23-09-2025\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/contractors\/bam-construct\/leaks-delay-bams-36m-passivhaus-leisure-centre-23-09-2025\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2025\/09\/blairgowrie-swimming-pool.webp\",\"datePublished\":\"2025-09-23T11:45:36+00:00\",\"author\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/482eae6a8521cf09396402a7e955effc\"},\"description\":\"Water ingress has caused a 34-week delay to the \u00a336m build of a Passivhaus-standard leisure centre in Scotland. Bam Construct had expected to finish\",\"breadcrumb\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/contractors\/bam-construct\/leaks-delay-bams-36m-passivhaus-leisure-centre-23-09-2025\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.constructionnews.co.uk\/contractors\/bam-construct\/leaks-delay-bams-36m-passivhaus-leisure-centre-23-09-2025\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/contractors\/bam-construct\/leaks-delay-bams-36m-passivhaus-leisure-centre-23-09-2025\/#primaryimage\",\"url\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2025\/09\/blairgowrie-swimming-pool.webp\",\"contentUrl\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2025\/09\/blairgowrie-swimming-pool.webp\",\"width\":1024,\"height\":683},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/contractors\/bam-construct\/leaks-delay-bams-36m-passivhaus-leisure-centre-23-09-2025\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.constructionnews.co.uk\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Leaks delay Bam\u2019s \u00a336m Passivhaus leisure centre\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#website\",\"url\":\"https:\/\/www.constructionnews.co.uk\/\",\"name\":\"Construction News\",\"description\":\"Read UK Construction Industry News, Analysis, Opinion and data\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.constructionnews.co.uk\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/482eae6a8521cf09396402a7e955effc\",\"name\":\"Joshua Stein\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/image\/09661283414c6a1a39b5867f8375fd1a\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/389df7f699e66c778382dc9b75d0d431e05c3bcf365a0418b8e7901b77e40c4b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/389df7f699e66c778382dc9b75d0d431e05c3bcf365a0418b8e7901b77e40c4b?s=96&d=mm&r=g\",\"caption\":\"Joshua Stein\"},\"url\":\"https:\/\/www.constructionnews.co.uk\/author\/joshua-stein\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Leaks delay Bam\u2019s \u00a336m Passivhaus leisure centre | Construction News","description":"Water ingress has caused a 34-week delay to the \u00a336m build of a Passivhaus-standard leisure centre in Scotland. Bam Construct had expected to finish","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionnews.co.uk\/contractors\/bam-construct\/leaks-delay-bams-36m-passivhaus-leisure-centre-23-09-2025\/","og_locale":"en_GB","og_type":"article","og_title":"Leaks delay Bam\u2019s \u00a336m Passivhaus leisure centre","og_description":"Water ingress has caused a 34-week delay to the \u00a336m build of a Passivhaus-standard leisure centre in Scotland. Bam Construct had expected to finish","og_url":"https:\/\/www.constructionnews.co.uk\/contractors\/bam-construct\/leaks-delay-bams-36m-passivhaus-leisure-centre-23-09-2025\/","og_site_name":"Construction News","article_publisher":"https:\/\/www.facebook.com\/CN.community","article_published_time":"2025-09-23T11:45:36+00:00","og_image":[{"url":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2025\/09\/blairgowrie-swimming-pool.webp","width":620,"height":414,"type":"image\/webp"}],"author":"Joshua Stein","twitter_card":"summary_large_image","twitter_creator":"@CNplus","twitter_site":"@CNplus","twitter_misc":{"Written by":"Joshua Stein","Estimated reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionnews.co.uk\/contractors\/bam-construct\/leaks-delay-bams-36m-passivhaus-leisure-centre-23-09-2025\/#article","isPartOf":{"@id":"https:\/\/www.constructionnews.co.uk\/contractors\/bam-construct\/leaks-delay-bams-36m-passivhaus-leisure-centre-23-09-2025\/"},"author":{"name":"Joshua Stein","@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/482eae6a8521cf09396402a7e955effc"},"headline":"Leaks delay Bam\u2019s \u00a336m Passivhaus leisure centre","datePublished":"2025-09-23T11:45:36+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionnews.co.uk\/contractors\/bam-construct\/leaks-delay-bams-36m-passivhaus-leisure-centre-23-09-2025\/"},"wordCount":473,"commentCount":0,"image":{"@id":"https:\/\/www.constructionnews.co.uk\/contractors\/bam-construct\/leaks-delay-bams-36m-passivhaus-leisure-centre-23-09-2025\/#primaryimage"},"thumbnailUrl":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2025\/09\/blairgowrie-swimming-pool.webp","articleSection":["Buildings","Royal Bam"],"inLanguage":"en-GB","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionnews.co.uk\/contractors\/bam-construct\/leaks-delay-bams-36m-passivhaus-leisure-centre-23-09-2025\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionnews.co.uk\/contractors\/bam-construct\/leaks-delay-bams-36m-passivhaus-leisure-centre-23-09-2025\/","url":"https:\/\/www.constructionnews.co.uk\/contractors\/bam-construct\/leaks-delay-bams-36m-passivhaus-leisure-centre-23-09-2025\/","name":"Leaks delay Bam\u2019s \u00a336m Passivhaus leisure centre | Construction News","isPartOf":{"@id":"https:\/\/www.constructionnews.co.uk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionnews.co.uk\/contractors\/bam-construct\/leaks-delay-bams-36m-passivhaus-leisure-centre-23-09-2025\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionnews.co.uk\/contractors\/bam-construct\/leaks-delay-bams-36m-passivhaus-leisure-centre-23-09-2025\/#primaryimage"},"thumbnailUrl":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2025\/09\/blairgowrie-swimming-pool.webp","datePublished":"2025-09-23T11:45:36+00:00","author":{"@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/482eae6a8521cf09396402a7e955effc"},"description":"Water ingress has caused a 34-week delay to the \u00a336m build of a Passivhaus-standard leisure centre in Scotland. Bam Construct had expected to finish","breadcrumb":{"@id":"https:\/\/www.constructionnews.co.uk\/contractors\/bam-construct\/leaks-delay-bams-36m-passivhaus-leisure-centre-23-09-2025\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionnews.co.uk\/contractors\/bam-construct\/leaks-delay-bams-36m-passivhaus-leisure-centre-23-09-2025\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.constructionnews.co.uk\/contractors\/bam-construct\/leaks-delay-bams-36m-passivhaus-leisure-centre-23-09-2025\/#primaryimage","url":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2025\/09\/blairgowrie-swimming-pool.webp","contentUrl":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2025\/09\/blairgowrie-swimming-pool.webp","width":1024,"height":683},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionnews.co.uk\/contractors\/bam-construct\/leaks-delay-bams-36m-passivhaus-leisure-centre-23-09-2025\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionnews.co.uk\/"},{"@type":"ListItem","position":2,"name":"Leaks delay Bam\u2019s \u00a336m Passivhaus leisure centre"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionnews.co.uk\/#website","url":"https:\/\/www.constructionnews.co.uk\/","name":"Construction News","description":"Read UK Construction Industry News, Analysis, Opinion and data","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionnews.co.uk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/482eae6a8521cf09396402a7e955effc","name":"Joshua Stein","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/image\/09661283414c6a1a39b5867f8375fd1a","url":"https:\/\/secure.gravatar.com\/avatar\/389df7f699e66c778382dc9b75d0d431e05c3bcf365a0418b8e7901b77e40c4b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/389df7f699e66c778382dc9b75d0d431e05c3bcf365a0418b8e7901b77e40c4b?s=96&d=mm&r=g","caption":"Joshua Stein"},"url":"https:\/\/www.constructionnews.co.uk\/author\/joshua-stein\/"}]}},"_links":{"self":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/529193","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/users\/90643"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/comments?post=529193"}],"version-history":[{"count":14,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/529193\/revisions"}],"predecessor-version":[{"id":529261,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/529193\/revisions\/529261"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/media\/529202"}],"wp:attachment":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/media?parent=529193"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/categories?post=529193"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/tags?post=529193"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}