{"id":532146,"date":"2025-11-04T14:30:26","date_gmt":"2025-11-04T14:30:26","guid":{"rendered":"https:\/\/www.constructionnews.co.uk\/?p=532146"},"modified":"2025-11-04T14:32:05","modified_gmt":"2025-11-04T14:32:05","slug":"nhs-commercial-solutions-awards-1bn-modular-framework","status":"publish","type":"post","link":"https:\/\/www.constructionnews.co.uk\/contracts\/nhs-commercial-solutions-awards-1bn-modular-framework-04-11-2025\/","title":{"rendered":"NHS Commercial Solutions awards \u00a31bn modular framework"},"content":{"rendered":"<p>NHS Commercial Solutions has named more than 40 firms to a new \u00a31bn framework to deliver modular and prefabricated building solutions for public sector clients.<\/p>\n<p>The four-year deal, awarded on 3 November, is divided into three lots: consultancy services, modular and prefabricated building works, and managed services.<\/p>\n<p>The framework will support the delivery of temporary and permanent buildings across healthcare, education and other public facilities.<\/p>\n<p>Clients will be able to procure a wide range of services, from design and project management to the construction and maintenance of offsite solutions.<\/p>\n<p>Associated services, such as staffing and medical equipment management, are also included.<\/p>\n<p>The largest portion of the work falls under Lot 2, which covers modular and prefabricated construction and has a maximum value of \u00a3600m.<\/p>\n<p>Premier Modular, MTX Contracts and Reds10 are among 24 firms appointed to this lot.<\/p>\n<p>Northumberland-based Merit Holdings is also named on Lot 2, although it <a href=\"https:\/\/www.constructionnews.co.uk\/tech\/offsite-mmc\/modular-specialist-merit-subsidiaries-file-for-administration-17-10-2025\/\">filed for administration<\/a> last month.<\/p>\n<p>Most of the suppliers are based in the UK, though Austria\u2019s Vamed Engineering and Dublin-based Vision Built Structures also secured places.<\/p>\n<p>Lot 1, worth up to \u00a3150m, covers consultancy services including architecture, engineering, planning and surveying.<\/p>\n<p>A total of 11 suppliers were appointed, including P+HS Architects, Tetra Tech and Avison Young.<\/p>\n<p>The \u00a3300m Lot 3 is for managed services, combining consultancy and construction with the delivery of medical equipment, IT infrastructure and staffing.<\/p>\n<p>Eight firms were named, including Vanguard Healthcare, GENMED ME and ModuleCo Healthcare.<\/p>\n<p>The framework is open to NHS organisations, central government departments, local authorities, and educational bodies across the UK. It allows for both direct award and mini-competition.<\/p>\n<h3>Lot 1: Consultancy Services<\/h3>\n<p><strong>Total contract value:<\/strong> \u00a3150m<br \/>\n<strong>Number of suppliers appointed:<\/strong> 11<\/p>\n<ol>\n<li>Low Carbon Europe<\/li>\n<li>MA Cost Consulting<\/li>\n<li>MTX Contracts<\/li>\n<li>P+HS Architects<\/li>\n<li>Premier Modular<\/li>\n<li>Tetra Tech<\/li>\n<li>Akerlof<\/li>\n<li>Avison Young<\/li>\n<li>exi<\/li>\n<li>Health Spaces<\/li>\n<li>Imaging Matters<\/li>\n<\/ol>\n<h3>Lot 2: Modular &amp; Prefabricated Building Solutions<\/h3>\n<p><strong>Total contract value:<\/strong> \u00a3600m<br \/>\n<strong>Number of suppliers appointed:<\/strong> 23<\/p>\n<ol>\n<li>Mac Zero Modular Buildings<\/li>\n<li>Mental Health Acute Pods<\/li>\n<li>Merit Holdings<\/li>\n<li>ModuleCo<\/li>\n<li>ModuleCo Healthcare<\/li>\n<li>Modulek<\/li>\n<li>MTX Contracts<\/li>\n<li>P McVey Building Systems<\/li>\n<li>Premier Modular<\/li>\n<li>Reds10 (UK)<\/li>\n<li>R G Stones (Buildings)<\/li>\n<li>McAvoy Modular Offsite<\/li>\n<li>The Portable Living Group<\/li>\n<li>Vamed Engineering (Austria)<\/li>\n<li>Vanguard Healthcare Solutions<\/li>\n<li>Vision Built Structures (Ireland)<\/li>\n<li>Wernick Buildings<\/li>\n<li>Western Building Systems<\/li>\n<li>Actiform<\/li>\n<li>Darwin Group<\/li>\n<li>Flexibilistay<\/li>\n<li>Health Spaces<\/li>\n<li>Imaging Matters<\/li>\n<\/ol>\n<h3>Lot 3: Managed Services<\/h3>\n<p><strong>Total contract value:<\/strong> \u00a3300m<br \/>\n<strong>Number of suppliers appointed:<\/strong> 8<\/p>\n<ol>\n<li>ModuleCo Healthcare<\/li>\n<li>MTX Contracts<\/li>\n<li>Premier Modular<\/li>\n<li>Vanguard Healthcare Solutions<\/li>\n<li>Darwin Group<\/li>\n<li>Ergea UK and Ireland<\/li>\n<li>GENMED ME<\/li>\n<li>Imaging Matters<\/li>\n<\/ol>\n<p><a href=\"https:\/\/www.find-tender.service.gov.uk\/Notice\/070841-2025\"><em>Source: Gov.uk Find a Tender<\/em><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>NHS Commercial Solutions has named more than 40 firms to a new \u00a31bn framework to deliver modular and prefabricated building solutions for public sector clients. The four-year deal, awarded on 3 November, is divided into three lots: consultancy services, modular and prefabricated building works, and managed services. The framework will support the delivery of temporary &#8230;<\/p>\n","protected":false},"author":129711,"featured_media":494433,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ep_exclude_from_search":false,"footnotes":""},"categories":[547,57172,558],"tags":[],"class_list":["post-532146","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-buildings","category-consultants","category-contracts"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.7 (Yoast SEO v26.7) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>NHS Commercial Solutions awards \u00a31bn modular framework | Construction News<\/title>\n<meta name=\"description\" content=\"NHS Commercial Solutions has named more than 40 firms to a new \u00a31bn framework to deliver modular and prefabricated building solutions for public sector\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionnews.co.uk\/contracts\/nhs-commercial-solutions-awards-1bn-modular-framework-04-11-2025\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"NHS Commercial Solutions awards \u00a31bn modular framework\" \/>\n<meta property=\"og:description\" content=\"NHS Commercial Solutions has named more than 40 firms to a new \u00a31bn framework to deliver modular and prefabricated building solutions for public sector\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionnews.co.uk\/contracts\/nhs-commercial-solutions-awards-1bn-modular-framework-04-11-2025\/\" \/>\n<meta property=\"og:site_name\" content=\"Construction News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/CN.community\" \/>\n<meta property=\"article:published_time\" content=\"2025-11-04T14:30:26+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-11-04T14:32:05+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2024\/02\/Modular_offsite_MMC.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"620\" \/>\n\t<meta property=\"og:image:height\" content=\"414\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Harmsworth\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@colinwmarrs\" \/>\n<meta name=\"twitter:site\" content=\"@CNplus\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Colin Marrs\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/contracts\/nhs-commercial-solutions-awards-1bn-modular-framework-04-11-2025\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/contracts\/nhs-commercial-solutions-awards-1bn-modular-framework-04-11-2025\/\"},\"author\":{\"name\":\"Colin Marrs\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/e7cd607a6a7d4ce88af3be7b4da62f1c\"},\"headline\":\"NHS Commercial Solutions awards \u00a31bn modular framework\",\"datePublished\":\"2025-11-04T14:30:26+00:00\",\"dateModified\":\"2025-11-04T14:32:05+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/contracts\/nhs-commercial-solutions-awards-1bn-modular-framework-04-11-2025\/\"},\"wordCount\":408,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/contracts\/nhs-commercial-solutions-awards-1bn-modular-framework-04-11-2025\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2024\/02\/Modular_offsite_MMC.jpg\",\"articleSection\":[\"Buildings\",\"Consultants\",\"Contracts\"],\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.constructionnews.co.uk\/contracts\/nhs-commercial-solutions-awards-1bn-modular-framework-04-11-2025\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/contracts\/nhs-commercial-solutions-awards-1bn-modular-framework-04-11-2025\/\",\"url\":\"https:\/\/www.constructionnews.co.uk\/contracts\/nhs-commercial-solutions-awards-1bn-modular-framework-04-11-2025\/\",\"name\":\"NHS Commercial Solutions awards \u00a31bn modular framework | Construction News\",\"isPartOf\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/contracts\/nhs-commercial-solutions-awards-1bn-modular-framework-04-11-2025\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/contracts\/nhs-commercial-solutions-awards-1bn-modular-framework-04-11-2025\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2024\/02\/Modular_offsite_MMC.jpg\",\"datePublished\":\"2025-11-04T14:30:26+00:00\",\"dateModified\":\"2025-11-04T14:32:05+00:00\",\"author\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/e7cd607a6a7d4ce88af3be7b4da62f1c\"},\"description\":\"NHS Commercial Solutions has named more than 40 firms to a new \u00a31bn framework to deliver modular and prefabricated building solutions for public sector\",\"breadcrumb\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/contracts\/nhs-commercial-solutions-awards-1bn-modular-framework-04-11-2025\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.constructionnews.co.uk\/contracts\/nhs-commercial-solutions-awards-1bn-modular-framework-04-11-2025\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/contracts\/nhs-commercial-solutions-awards-1bn-modular-framework-04-11-2025\/#primaryimage\",\"url\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2024\/02\/Modular_offsite_MMC.jpg\",\"contentUrl\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2024\/02\/Modular_offsite_MMC.jpg\",\"width\":1024,\"height\":683},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/contracts\/nhs-commercial-solutions-awards-1bn-modular-framework-04-11-2025\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.constructionnews.co.uk\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"NHS Commercial Solutions awards \u00a31bn modular framework\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#website\",\"url\":\"https:\/\/www.constructionnews.co.uk\/\",\"name\":\"Construction News\",\"description\":\"Read UK Construction Industry News, Analysis, Opinion and data\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.constructionnews.co.uk\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/e7cd607a6a7d4ce88af3be7b4da62f1c\",\"name\":\"Colin Marrs\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/image\/278a9a6c3a20aad2b4da46dc3bb11d88\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/d0d0581b079dfbcce26e08273a906cc6e24b91ca7352a3c8c9bfcf2683acfe2e?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/d0d0581b079dfbcce26e08273a906cc6e24b91ca7352a3c8c9bfcf2683acfe2e?s=96&d=mm&r=g\",\"caption\":\"Colin Marrs\"},\"description\":\"Colin has led the Construction News editorial team since joining the title as editor in 2022. He has 30 years of journalism experience on a variety of built environment and public sector titles. In his spare time, he likes playing poker, sings in a choir and is a long-term Norwich City sufferer.\",\"sameAs\":[\"https:\/\/x.com\/colinwmarrs\"],\"url\":\"https:\/\/www.constructionnews.co.uk\/author\/colin-marrs-4\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"NHS Commercial Solutions awards \u00a31bn modular framework | Construction News","description":"NHS Commercial Solutions has named more than 40 firms to a new \u00a31bn framework to deliver modular and prefabricated building solutions for public sector","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionnews.co.uk\/contracts\/nhs-commercial-solutions-awards-1bn-modular-framework-04-11-2025\/","og_locale":"en_GB","og_type":"article","og_title":"NHS Commercial Solutions awards \u00a31bn modular framework","og_description":"NHS Commercial Solutions has named more than 40 firms to a new \u00a31bn framework to deliver modular and prefabricated building solutions for public sector","og_url":"https:\/\/www.constructionnews.co.uk\/contracts\/nhs-commercial-solutions-awards-1bn-modular-framework-04-11-2025\/","og_site_name":"Construction News","article_publisher":"https:\/\/www.facebook.com\/CN.community","article_published_time":"2025-11-04T14:30:26+00:00","article_modified_time":"2025-11-04T14:32:05+00:00","og_image":[{"url":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2024\/02\/Modular_offsite_MMC.jpg","width":620,"height":414,"type":"image\/jpeg"}],"author":"Harmsworth","twitter_card":"summary_large_image","twitter_creator":"@colinwmarrs","twitter_site":"@CNplus","twitter_misc":{"Written by":"Colin Marrs","Estimated reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionnews.co.uk\/contracts\/nhs-commercial-solutions-awards-1bn-modular-framework-04-11-2025\/#article","isPartOf":{"@id":"https:\/\/www.constructionnews.co.uk\/contracts\/nhs-commercial-solutions-awards-1bn-modular-framework-04-11-2025\/"},"author":{"name":"Colin Marrs","@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/e7cd607a6a7d4ce88af3be7b4da62f1c"},"headline":"NHS Commercial Solutions awards \u00a31bn modular framework","datePublished":"2025-11-04T14:30:26+00:00","dateModified":"2025-11-04T14:32:05+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionnews.co.uk\/contracts\/nhs-commercial-solutions-awards-1bn-modular-framework-04-11-2025\/"},"wordCount":408,"commentCount":0,"image":{"@id":"https:\/\/www.constructionnews.co.uk\/contracts\/nhs-commercial-solutions-awards-1bn-modular-framework-04-11-2025\/#primaryimage"},"thumbnailUrl":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2024\/02\/Modular_offsite_MMC.jpg","articleSection":["Buildings","Consultants","Contracts"],"inLanguage":"en-GB","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionnews.co.uk\/contracts\/nhs-commercial-solutions-awards-1bn-modular-framework-04-11-2025\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionnews.co.uk\/contracts\/nhs-commercial-solutions-awards-1bn-modular-framework-04-11-2025\/","url":"https:\/\/www.constructionnews.co.uk\/contracts\/nhs-commercial-solutions-awards-1bn-modular-framework-04-11-2025\/","name":"NHS Commercial Solutions awards \u00a31bn modular framework | Construction News","isPartOf":{"@id":"https:\/\/www.constructionnews.co.uk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionnews.co.uk\/contracts\/nhs-commercial-solutions-awards-1bn-modular-framework-04-11-2025\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionnews.co.uk\/contracts\/nhs-commercial-solutions-awards-1bn-modular-framework-04-11-2025\/#primaryimage"},"thumbnailUrl":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2024\/02\/Modular_offsite_MMC.jpg","datePublished":"2025-11-04T14:30:26+00:00","dateModified":"2025-11-04T14:32:05+00:00","author":{"@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/e7cd607a6a7d4ce88af3be7b4da62f1c"},"description":"NHS Commercial Solutions has named more than 40 firms to a new \u00a31bn framework to deliver modular and prefabricated building solutions for public sector","breadcrumb":{"@id":"https:\/\/www.constructionnews.co.uk\/contracts\/nhs-commercial-solutions-awards-1bn-modular-framework-04-11-2025\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionnews.co.uk\/contracts\/nhs-commercial-solutions-awards-1bn-modular-framework-04-11-2025\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.constructionnews.co.uk\/contracts\/nhs-commercial-solutions-awards-1bn-modular-framework-04-11-2025\/#primaryimage","url":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2024\/02\/Modular_offsite_MMC.jpg","contentUrl":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2024\/02\/Modular_offsite_MMC.jpg","width":1024,"height":683},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionnews.co.uk\/contracts\/nhs-commercial-solutions-awards-1bn-modular-framework-04-11-2025\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionnews.co.uk\/"},{"@type":"ListItem","position":2,"name":"NHS Commercial Solutions awards \u00a31bn modular framework"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionnews.co.uk\/#website","url":"https:\/\/www.constructionnews.co.uk\/","name":"Construction News","description":"Read UK Construction Industry News, Analysis, Opinion and data","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionnews.co.uk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/e7cd607a6a7d4ce88af3be7b4da62f1c","name":"Colin Marrs","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/image\/278a9a6c3a20aad2b4da46dc3bb11d88","url":"https:\/\/secure.gravatar.com\/avatar\/d0d0581b079dfbcce26e08273a906cc6e24b91ca7352a3c8c9bfcf2683acfe2e?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d0d0581b079dfbcce26e08273a906cc6e24b91ca7352a3c8c9bfcf2683acfe2e?s=96&d=mm&r=g","caption":"Colin Marrs"},"description":"Colin has led the Construction News editorial team since joining the title as editor in 2022. He has 30 years of journalism experience on a variety of built environment and public sector titles. In his spare time, he likes playing poker, sings in a choir and is a long-term Norwich City sufferer.","sameAs":["https:\/\/x.com\/colinwmarrs"],"url":"https:\/\/www.constructionnews.co.uk\/author\/colin-marrs-4\/"}]}},"_links":{"self":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/532146","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/users\/129711"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/comments?post=532146"}],"version-history":[{"count":2,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/532146\/revisions"}],"predecessor-version":[{"id":532149,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/532146\/revisions\/532149"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/media\/494433"}],"wp:attachment":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/media?parent=532146"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/categories?post=532146"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/tags?post=532146"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}