{"id":534175,"date":"2025-12-08T12:45:34","date_gmt":"2025-12-08T12:45:34","guid":{"rendered":"https:\/\/www.constructionnews.co.uk\/?p=534175"},"modified":"2025-12-08T09:07:07","modified_gmt":"2025-12-08T09:07:07","slug":"willmott-dixon-in-line-to-build-delayed-31m-passivhaus-leisure-centre","status":"publish","type":"post","link":"https:\/\/www.constructionnews.co.uk\/buildings\/willmott-dixon-in-line-to-build-delayed-31m-passivhaus-leisure-centre-08-12-2025\/","title":{"rendered":"Willmott Dixon in line to build delayed \u00a331m Passivhaus leisure centre"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">Willmott Dixon has been named as the preferred bidder to build a \u00a331m Passivhaus leisure centre in Surrey that has been delayed amid unfavourable market conditions.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Waverley Borough Council originally said construction work on Cranleigh Leisure Centre would start this autumn after it obtained planning permission in March.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">However, in its latest update, the local authority said work would begin next summer.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u201cWe continue to make steady progress behind the scenes to get everything in place for the start of construction,\u201d the council said.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Planning permission had come with \u201cseveral conditions that took time to resolve\u201d, it added.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u201cDuring this period, market conditions changed significantly, prompting a thorough review of the project,\u201d the council said. \u201cAs a result, the timeline has been revised.\u201d<\/span><\/p>\n<p><i><span style=\"font-weight: 400;\">Construction News <\/span><\/i><span style=\"font-weight: 400;\">understands that <a href=\"https:\/\/www.constructionnews.co.uk\/contractors\/willmott-dixon\/\">Willmott Dixon<\/a> is now working to agree a pre-construction services agreement.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The council\u2019s portfolio holder for planning and development, Liz Townsend, said the local authority was \u201cmoving forward with this exciting next phase, working together with Willmott Dixon to agree final designs, costs and timelines\u201d.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The new centre is expected to open in winter 2027, having previously been slated for spring 2027.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The facility \u2013 which will be built to Passivhaus sustainability standards \u2013 will include a six-lane 25-metre swimming pool, gym, soft play area and cafe.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">An existing 55-year-old leisure centre that has \u201cexceeded its life expectancy\u201d will be demolished once the new facility is built, the council said.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Cranleigh Leisure Centre is expected to use 60 per cent less energy per square metre than the old building in operation, with a forecast 75 per cent reduction<\/span> <span style=\"font-weight: 400;\">in annual operational carbon emissions.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The council approved a \u201crevised\u201d capital budget of about \u00a331m for the scheme in October 2023. It had originally looked at plans for a new facility in 2018, before all capital projects were put on hold due to the Covid pandemic.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Other ongoing new leisure centre jobs for Willmott Dixon include a \u00a331.5m build in Leighton Buzzard, Bedfordshire.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Willmott Dixon has been named as the preferred bidder to build a \u00a331m Passivhaus leisure centre in Surrey that has been delayed amid unfavourable market conditions. Waverley Borough Council originally said construction work on Cranleigh Leisure Centre would start this autumn after it obtained planning permission in March. However, in its latest update, the local &#8230;<\/p>\n","protected":false},"author":29901,"featured_media":534186,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ep_exclude_from_search":false,"footnotes":""},"categories":[547,558,546],"tags":[],"class_list":["post-534175","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-buildings","category-contracts","category-willmott-dixon"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.7 (Yoast SEO v26.7) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Willmott Dixon in line to build delayed \u00a331m Passivhaus leisure centre | Construction News<\/title>\n<meta name=\"description\" content=\"Willmott Dixon has been named as the preferred bidder to build a \u00a331m Passivhaus leisure centre in Surrey that has been delayed amid unfavourable market\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionnews.co.uk\/buildings\/willmott-dixon-in-line-to-build-delayed-31m-passivhaus-leisure-centre-08-12-2025\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Willmott Dixon in line to build delayed \u00a331m Passivhaus leisure centre\" \/>\n<meta property=\"og:description\" content=\"Willmott Dixon has been named as the preferred bidder to build a \u00a331m Passivhaus leisure centre in Surrey that has been delayed amid unfavourable market\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionnews.co.uk\/buildings\/willmott-dixon-in-line-to-build-delayed-31m-passivhaus-leisure-centre-08-12-2025\/\" \/>\n<meta property=\"og:site_name\" content=\"Construction News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/CN.community\" \/>\n<meta property=\"article:published_time\" content=\"2025-12-08T12:45:34+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2025\/12\/img-the-new-clc-website-image-850-400-c-c-90.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"620\" \/>\n\t<meta property=\"og:image:height\" content=\"413\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"James Wilmore\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@CNplus\" \/>\n<meta name=\"twitter:site\" content=\"@CNplus\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"James Wilmore\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/buildings\/willmott-dixon-in-line-to-build-delayed-31m-passivhaus-leisure-centre-08-12-2025\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/buildings\/willmott-dixon-in-line-to-build-delayed-31m-passivhaus-leisure-centre-08-12-2025\/\"},\"author\":{\"name\":\"James Wilmore\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/d1ebbf20319c2e51d2e12ee4ed317bb9\"},\"headline\":\"Willmott Dixon in line to build delayed \u00a331m Passivhaus leisure centre\",\"datePublished\":\"2025-12-08T12:45:34+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/buildings\/willmott-dixon-in-line-to-build-delayed-31m-passivhaus-leisure-centre-08-12-2025\/\"},\"wordCount\":332,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/buildings\/willmott-dixon-in-line-to-build-delayed-31m-passivhaus-leisure-centre-08-12-2025\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2025\/12\/img-the-new-clc-website-image-850-400-c-c-90.webp\",\"articleSection\":[\"Buildings\",\"Contracts\",\"Willmott Dixon\"],\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.constructionnews.co.uk\/buildings\/willmott-dixon-in-line-to-build-delayed-31m-passivhaus-leisure-centre-08-12-2025\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/buildings\/willmott-dixon-in-line-to-build-delayed-31m-passivhaus-leisure-centre-08-12-2025\/\",\"url\":\"https:\/\/www.constructionnews.co.uk\/buildings\/willmott-dixon-in-line-to-build-delayed-31m-passivhaus-leisure-centre-08-12-2025\/\",\"name\":\"Willmott Dixon in line to build delayed \u00a331m Passivhaus leisure centre | Construction News\",\"isPartOf\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/buildings\/willmott-dixon-in-line-to-build-delayed-31m-passivhaus-leisure-centre-08-12-2025\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/buildings\/willmott-dixon-in-line-to-build-delayed-31m-passivhaus-leisure-centre-08-12-2025\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2025\/12\/img-the-new-clc-website-image-850-400-c-c-90.webp\",\"datePublished\":\"2025-12-08T12:45:34+00:00\",\"author\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/d1ebbf20319c2e51d2e12ee4ed317bb9\"},\"description\":\"Willmott Dixon has been named as the preferred bidder to build a \u00a331m Passivhaus leisure centre in Surrey that has been delayed amid unfavourable market\",\"breadcrumb\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/buildings\/willmott-dixon-in-line-to-build-delayed-31m-passivhaus-leisure-centre-08-12-2025\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.constructionnews.co.uk\/buildings\/willmott-dixon-in-line-to-build-delayed-31m-passivhaus-leisure-centre-08-12-2025\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/buildings\/willmott-dixon-in-line-to-build-delayed-31m-passivhaus-leisure-centre-08-12-2025\/#primaryimage\",\"url\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2025\/12\/img-the-new-clc-website-image-850-400-c-c-90.webp\",\"contentUrl\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2025\/12\/img-the-new-clc-website-image-850-400-c-c-90.webp\",\"width\":1025,\"height\":683,\"caption\":\"CGI of Cranleigh Leisure Centre. Credit: Waverley Borough Council\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/buildings\/willmott-dixon-in-line-to-build-delayed-31m-passivhaus-leisure-centre-08-12-2025\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.constructionnews.co.uk\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Willmott Dixon in line to build delayed \u00a331m Passivhaus leisure centre\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#website\",\"url\":\"https:\/\/www.constructionnews.co.uk\/\",\"name\":\"Construction News\",\"description\":\"Read UK Construction Industry News, Analysis, Opinion and data\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.constructionnews.co.uk\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/d1ebbf20319c2e51d2e12ee4ed317bb9\",\"name\":\"James Wilmore\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/image\/7c8a1cb46bd799dd6e046ff4f5f46a30\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/cc73b8134540c7b619001344b687215527ea2b6dadf79972234eaa04c15e4c35?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/cc73b8134540c7b619001344b687215527ea2b6dadf79972234eaa04c15e4c35?s=96&d=mm&r=g\",\"caption\":\"James Wilmore\"},\"url\":\"https:\/\/www.constructionnews.co.uk\/author\/james-wilmore-4\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Willmott Dixon in line to build delayed \u00a331m Passivhaus leisure centre | Construction News","description":"Willmott Dixon has been named as the preferred bidder to build a \u00a331m Passivhaus leisure centre in Surrey that has been delayed amid unfavourable market","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionnews.co.uk\/buildings\/willmott-dixon-in-line-to-build-delayed-31m-passivhaus-leisure-centre-08-12-2025\/","og_locale":"en_GB","og_type":"article","og_title":"Willmott Dixon in line to build delayed \u00a331m Passivhaus leisure centre","og_description":"Willmott Dixon has been named as the preferred bidder to build a \u00a331m Passivhaus leisure centre in Surrey that has been delayed amid unfavourable market","og_url":"https:\/\/www.constructionnews.co.uk\/buildings\/willmott-dixon-in-line-to-build-delayed-31m-passivhaus-leisure-centre-08-12-2025\/","og_site_name":"Construction News","article_publisher":"https:\/\/www.facebook.com\/CN.community","article_published_time":"2025-12-08T12:45:34+00:00","og_image":[{"url":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2025\/12\/img-the-new-clc-website-image-850-400-c-c-90.webp","width":620,"height":413,"type":"image\/webp"}],"author":"James Wilmore","twitter_card":"summary_large_image","twitter_creator":"@CNplus","twitter_site":"@CNplus","twitter_misc":{"Written by":"James Wilmore","Estimated reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionnews.co.uk\/buildings\/willmott-dixon-in-line-to-build-delayed-31m-passivhaus-leisure-centre-08-12-2025\/#article","isPartOf":{"@id":"https:\/\/www.constructionnews.co.uk\/buildings\/willmott-dixon-in-line-to-build-delayed-31m-passivhaus-leisure-centre-08-12-2025\/"},"author":{"name":"James Wilmore","@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/d1ebbf20319c2e51d2e12ee4ed317bb9"},"headline":"Willmott Dixon in line to build delayed \u00a331m Passivhaus leisure centre","datePublished":"2025-12-08T12:45:34+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionnews.co.uk\/buildings\/willmott-dixon-in-line-to-build-delayed-31m-passivhaus-leisure-centre-08-12-2025\/"},"wordCount":332,"commentCount":0,"image":{"@id":"https:\/\/www.constructionnews.co.uk\/buildings\/willmott-dixon-in-line-to-build-delayed-31m-passivhaus-leisure-centre-08-12-2025\/#primaryimage"},"thumbnailUrl":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2025\/12\/img-the-new-clc-website-image-850-400-c-c-90.webp","articleSection":["Buildings","Contracts","Willmott Dixon"],"inLanguage":"en-GB","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionnews.co.uk\/buildings\/willmott-dixon-in-line-to-build-delayed-31m-passivhaus-leisure-centre-08-12-2025\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionnews.co.uk\/buildings\/willmott-dixon-in-line-to-build-delayed-31m-passivhaus-leisure-centre-08-12-2025\/","url":"https:\/\/www.constructionnews.co.uk\/buildings\/willmott-dixon-in-line-to-build-delayed-31m-passivhaus-leisure-centre-08-12-2025\/","name":"Willmott Dixon in line to build delayed \u00a331m Passivhaus leisure centre | Construction News","isPartOf":{"@id":"https:\/\/www.constructionnews.co.uk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionnews.co.uk\/buildings\/willmott-dixon-in-line-to-build-delayed-31m-passivhaus-leisure-centre-08-12-2025\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionnews.co.uk\/buildings\/willmott-dixon-in-line-to-build-delayed-31m-passivhaus-leisure-centre-08-12-2025\/#primaryimage"},"thumbnailUrl":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2025\/12\/img-the-new-clc-website-image-850-400-c-c-90.webp","datePublished":"2025-12-08T12:45:34+00:00","author":{"@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/d1ebbf20319c2e51d2e12ee4ed317bb9"},"description":"Willmott Dixon has been named as the preferred bidder to build a \u00a331m Passivhaus leisure centre in Surrey that has been delayed amid unfavourable market","breadcrumb":{"@id":"https:\/\/www.constructionnews.co.uk\/buildings\/willmott-dixon-in-line-to-build-delayed-31m-passivhaus-leisure-centre-08-12-2025\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionnews.co.uk\/buildings\/willmott-dixon-in-line-to-build-delayed-31m-passivhaus-leisure-centre-08-12-2025\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.constructionnews.co.uk\/buildings\/willmott-dixon-in-line-to-build-delayed-31m-passivhaus-leisure-centre-08-12-2025\/#primaryimage","url":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2025\/12\/img-the-new-clc-website-image-850-400-c-c-90.webp","contentUrl":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2025\/12\/img-the-new-clc-website-image-850-400-c-c-90.webp","width":1025,"height":683,"caption":"CGI of Cranleigh Leisure Centre. Credit: Waverley Borough Council"},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionnews.co.uk\/buildings\/willmott-dixon-in-line-to-build-delayed-31m-passivhaus-leisure-centre-08-12-2025\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionnews.co.uk\/"},{"@type":"ListItem","position":2,"name":"Willmott Dixon in line to build delayed \u00a331m Passivhaus leisure centre"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionnews.co.uk\/#website","url":"https:\/\/www.constructionnews.co.uk\/","name":"Construction News","description":"Read UK Construction Industry News, Analysis, Opinion and data","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionnews.co.uk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/d1ebbf20319c2e51d2e12ee4ed317bb9","name":"James Wilmore","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/image\/7c8a1cb46bd799dd6e046ff4f5f46a30","url":"https:\/\/secure.gravatar.com\/avatar\/cc73b8134540c7b619001344b687215527ea2b6dadf79972234eaa04c15e4c35?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/cc73b8134540c7b619001344b687215527ea2b6dadf79972234eaa04c15e4c35?s=96&d=mm&r=g","caption":"James Wilmore"},"url":"https:\/\/www.constructionnews.co.uk\/author\/james-wilmore-4\/"}]}},"_links":{"self":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/534175","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/users\/29901"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/comments?post=534175"}],"version-history":[{"count":12,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/534175\/revisions"}],"predecessor-version":[{"id":534190,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/534175\/revisions\/534190"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/media\/534186"}],"wp:attachment":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/media?parent=534175"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/categories?post=534175"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/tags?post=534175"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}