{"id":537025,"date":"2026-01-28T13:01:00","date_gmt":"2026-01-28T13:01:00","guid":{"rendered":"https:\/\/www.constructionnews.co.uk\/?p=537025"},"modified":"2026-01-28T15:00:07","modified_gmt":"2026-01-28T15:00:07","slug":"bsr-rows-back-on-legacy-gateway-application-threat","status":"publish","type":"post","link":"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/bsr-rows-back-on-legacy-gateway-application-threat-28-01-2026\/","title":{"rendered":"BSR rows back on legacy gateway application threat"},"content":{"rendered":"<p>Building Safety Regulator (BSR) chairman Andy Roe has played down the prospects of his body taking a hardline approach on legacy gateway two applications.<\/p>\n<p>The BSR said in a document released\u00a0 on Tuesday (27 January) that it would reject projects stuck in the gateway if \u201cachieving an approval within the next one to two months is unlikely\u201d.<\/p>\n<p>However, speaking at a press briefing this morning, Roe (pictured) told <em>Construction News<\/em> there would \u201cnot be a hard stop\u201d on rejecting gateway two applications.<\/p>\n<p>Roe said the BSR has a \u201cresponsibility, as far as is reasonable, to get those applications across the line because our system wasn&#8217;t working properly\u201d.<\/p>\n<p>However, he said: \u201cIf we simply can&#8217;t agree on a matter of principle, design or safety, we&#8217;ll have to call a halt to it, obviously,\u201d he added.<\/p>\n<p>The BSR committed in October to clearing <a href=\"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/gateway-two-backlog-set-to-be-eliminated-by-january-20-10-2025\/\" target=\"_blank\" rel=\"noopener noreferrer\" data-sk=\"tooltip_parent\">the gateway two backlog by January<\/a>, after it had faced issues surrounding staff availability, complexity and \u201cinformation needs from [the] applicant or BSR\u201d.<\/p>\n<p>In its latest progress report, the BSR said it had reduced its caseload of legacy applications to the gateway from 81 at the start of November to 29.<\/p>\n<p>\u201cThe approval rate of these older cases continues to be high at 87 per cent as we strive to do all we can to achieve successful outcomes,\u201d it added.<\/p>\n<p>But it said the leftover cases were using up \u201csignificant BSR resources\u201d and it was assessing whether they were likely to complete the remaining cases in the next two months.<\/p>\n<p>\u201c[If] the information gap that remains means that achieving an approval within the next one to two months is unlikely [\u2026] then those cases will be rejected,\u201d the BSR said.<\/p>\n<p>The BSR also confirmed plans to bring forward a Remediation Improvement Plan in a bid to drive down live cases relating to remediating unsafe buildings in 2026, as <a href=\"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/exclusive-bsr-in-building-remediation-case-drive-19-01-2026\/\">revealed by\u00a0<em>CN\u00a0<\/em>earlier this month<\/a>.<\/p>\n<p>Earlier this week, <a href=\"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/bsr-to-become-independent-in-new-year-13-11-2025\/\">the BSR formally became a standalone entity<\/a>, the first step in a move to create a single construction regulator.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Building Safety Regulator (BSR) chairman Andy Roe has played down the prospects of his body taking a hardline approach on legacy gateway two applications. The BSR said in a document released\u00a0 on Tuesday (27 January) that it would reject projects stuck in the gateway if \u201cachieving an approval within the next one to two months &#8230;<\/p>\n","protected":false},"author":90643,"featured_media":528006,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ep_exclude_from_search":false,"footnotes":""},"categories":[79552,565],"tags":[],"class_list":["post-537025","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-building-safety","category-government","issue-online-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.7 (Yoast SEO v26.7) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>BSR rows back on legacy gateway application threat | Construction News<\/title>\n<meta name=\"description\" content=\"Building Safety Regulator (BSR) chairman Andy Roe has played down the prospects of his body taking a hardline approach on legacy gateway two applications.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/bsr-rows-back-on-legacy-gateway-application-threat-28-01-2026\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"BSR rows back on legacy gateway application threat\" \/>\n<meta property=\"og:description\" content=\"Building Safety Regulator (BSR) chairman Andy Roe has played down the prospects of his body taking a hardline approach on legacy gateway two applications.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/bsr-rows-back-on-legacy-gateway-application-threat-28-01-2026\/\" \/>\n<meta property=\"og:site_name\" content=\"Construction News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/CN.community\" \/>\n<meta property=\"article:published_time\" content=\"2026-01-28T13:01:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-01-28T15:00:07+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2025\/09\/a2f81b55-720f-4949-8064-7038675df4ae_1024x683_144dpi.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"620\" \/>\n\t<meta property=\"og:image:height\" content=\"414\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"Joshua Stein\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@CNplus\" \/>\n<meta name=\"twitter:site\" content=\"@CNplus\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Joshua Stein\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/bsr-rows-back-on-legacy-gateway-application-threat-28-01-2026\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/bsr-rows-back-on-legacy-gateway-application-threat-28-01-2026\/\"},\"author\":{\"name\":\"Joshua Stein\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/482eae6a8521cf09396402a7e955effc\"},\"headline\":\"BSR rows back on legacy gateway application threat\",\"datePublished\":\"2026-01-28T13:01:00+00:00\",\"dateModified\":\"2026-01-28T15:00:07+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/bsr-rows-back-on-legacy-gateway-application-threat-28-01-2026\/\"},\"wordCount\":342,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/bsr-rows-back-on-legacy-gateway-application-threat-28-01-2026\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2025\/09\/a2f81b55-720f-4949-8064-7038675df4ae_1024x683_144dpi.webp\",\"articleSection\":[\"Building safety\",\"Government\"],\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/bsr-rows-back-on-legacy-gateway-application-threat-28-01-2026\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/bsr-rows-back-on-legacy-gateway-application-threat-28-01-2026\/\",\"url\":\"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/bsr-rows-back-on-legacy-gateway-application-threat-28-01-2026\/\",\"name\":\"BSR rows back on legacy gateway application threat | Construction News\",\"isPartOf\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/bsr-rows-back-on-legacy-gateway-application-threat-28-01-2026\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/bsr-rows-back-on-legacy-gateway-application-threat-28-01-2026\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2025\/09\/a2f81b55-720f-4949-8064-7038675df4ae_1024x683_144dpi.webp\",\"datePublished\":\"2026-01-28T13:01:00+00:00\",\"dateModified\":\"2026-01-28T15:00:07+00:00\",\"author\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/482eae6a8521cf09396402a7e955effc\"},\"description\":\"Building Safety Regulator (BSR) chairman Andy Roe has played down the prospects of his body taking a hardline approach on legacy gateway two applications.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/bsr-rows-back-on-legacy-gateway-application-threat-28-01-2026\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/bsr-rows-back-on-legacy-gateway-application-threat-28-01-2026\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/bsr-rows-back-on-legacy-gateway-application-threat-28-01-2026\/#primaryimage\",\"url\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2025\/09\/a2f81b55-720f-4949-8064-7038675df4ae_1024x683_144dpi.webp\",\"contentUrl\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2025\/09\/a2f81b55-720f-4949-8064-7038675df4ae_1024x683_144dpi.webp\",\"width\":1024,\"height\":683,\"caption\":\"Andy Roe\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/bsr-rows-back-on-legacy-gateway-application-threat-28-01-2026\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.constructionnews.co.uk\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"BSR rows back on legacy gateway application threat\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#website\",\"url\":\"https:\/\/www.constructionnews.co.uk\/\",\"name\":\"Construction News\",\"description\":\"Read UK Construction Industry News, Analysis, Opinion and data\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.constructionnews.co.uk\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/482eae6a8521cf09396402a7e955effc\",\"name\":\"Joshua Stein\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/image\/09661283414c6a1a39b5867f8375fd1a\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/389df7f699e66c778382dc9b75d0d431e05c3bcf365a0418b8e7901b77e40c4b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/389df7f699e66c778382dc9b75d0d431e05c3bcf365a0418b8e7901b77e40c4b?s=96&d=mm&r=g\",\"caption\":\"Joshua Stein\"},\"url\":\"https:\/\/www.constructionnews.co.uk\/author\/joshua-stein\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"BSR rows back on legacy gateway application threat | Construction News","description":"Building Safety Regulator (BSR) chairman Andy Roe has played down the prospects of his body taking a hardline approach on legacy gateway two applications.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/bsr-rows-back-on-legacy-gateway-application-threat-28-01-2026\/","og_locale":"en_GB","og_type":"article","og_title":"BSR rows back on legacy gateway application threat","og_description":"Building Safety Regulator (BSR) chairman Andy Roe has played down the prospects of his body taking a hardline approach on legacy gateway two applications.","og_url":"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/bsr-rows-back-on-legacy-gateway-application-threat-28-01-2026\/","og_site_name":"Construction News","article_publisher":"https:\/\/www.facebook.com\/CN.community","article_published_time":"2026-01-28T13:01:00+00:00","article_modified_time":"2026-01-28T15:00:07+00:00","og_image":[{"url":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2025\/09\/a2f81b55-720f-4949-8064-7038675df4ae_1024x683_144dpi.webp","width":620,"height":414,"type":"image\/webp"}],"author":"Joshua Stein","twitter_card":"summary_large_image","twitter_creator":"@CNplus","twitter_site":"@CNplus","twitter_misc":{"Written by":"Joshua Stein","Estimated reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/bsr-rows-back-on-legacy-gateway-application-threat-28-01-2026\/#article","isPartOf":{"@id":"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/bsr-rows-back-on-legacy-gateway-application-threat-28-01-2026\/"},"author":{"name":"Joshua Stein","@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/482eae6a8521cf09396402a7e955effc"},"headline":"BSR rows back on legacy gateway application threat","datePublished":"2026-01-28T13:01:00+00:00","dateModified":"2026-01-28T15:00:07+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/bsr-rows-back-on-legacy-gateway-application-threat-28-01-2026\/"},"wordCount":342,"commentCount":0,"image":{"@id":"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/bsr-rows-back-on-legacy-gateway-application-threat-28-01-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2025\/09\/a2f81b55-720f-4949-8064-7038675df4ae_1024x683_144dpi.webp","articleSection":["Building safety","Government"],"inLanguage":"en-GB","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/bsr-rows-back-on-legacy-gateway-application-threat-28-01-2026\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/bsr-rows-back-on-legacy-gateway-application-threat-28-01-2026\/","url":"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/bsr-rows-back-on-legacy-gateway-application-threat-28-01-2026\/","name":"BSR rows back on legacy gateway application threat | Construction News","isPartOf":{"@id":"https:\/\/www.constructionnews.co.uk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/bsr-rows-back-on-legacy-gateway-application-threat-28-01-2026\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/bsr-rows-back-on-legacy-gateway-application-threat-28-01-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2025\/09\/a2f81b55-720f-4949-8064-7038675df4ae_1024x683_144dpi.webp","datePublished":"2026-01-28T13:01:00+00:00","dateModified":"2026-01-28T15:00:07+00:00","author":{"@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/482eae6a8521cf09396402a7e955effc"},"description":"Building Safety Regulator (BSR) chairman Andy Roe has played down the prospects of his body taking a hardline approach on legacy gateway two applications.","breadcrumb":{"@id":"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/bsr-rows-back-on-legacy-gateway-application-threat-28-01-2026\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/bsr-rows-back-on-legacy-gateway-application-threat-28-01-2026\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/bsr-rows-back-on-legacy-gateway-application-threat-28-01-2026\/#primaryimage","url":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2025\/09\/a2f81b55-720f-4949-8064-7038675df4ae_1024x683_144dpi.webp","contentUrl":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2025\/09\/a2f81b55-720f-4949-8064-7038675df4ae_1024x683_144dpi.webp","width":1024,"height":683,"caption":"Andy Roe"},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/bsr-rows-back-on-legacy-gateway-application-threat-28-01-2026\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionnews.co.uk\/"},{"@type":"ListItem","position":2,"name":"BSR rows back on legacy gateway application threat"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionnews.co.uk\/#website","url":"https:\/\/www.constructionnews.co.uk\/","name":"Construction News","description":"Read UK Construction Industry News, Analysis, Opinion and data","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionnews.co.uk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/482eae6a8521cf09396402a7e955effc","name":"Joshua Stein","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/image\/09661283414c6a1a39b5867f8375fd1a","url":"https:\/\/secure.gravatar.com\/avatar\/389df7f699e66c778382dc9b75d0d431e05c3bcf365a0418b8e7901b77e40c4b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/389df7f699e66c778382dc9b75d0d431e05c3bcf365a0418b8e7901b77e40c4b?s=96&d=mm&r=g","caption":"Joshua Stein"},"url":"https:\/\/www.constructionnews.co.uk\/author\/joshua-stein\/"}]}},"_links":{"self":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/537025","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/users\/90643"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/comments?post=537025"}],"version-history":[{"count":10,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/537025\/revisions"}],"predecessor-version":[{"id":537050,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/537025\/revisions\/537050"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/media\/528006"}],"wp:attachment":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/media?parent=537025"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/categories?post=537025"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/tags?post=537025"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}