{"id":537449,"date":"2026-02-04T12:45:18","date_gmt":"2026-02-04T12:45:18","guid":{"rendered":"https:\/\/www.constructionnews.co.uk\/?p=537449"},"modified":"2026-02-04T13:52:30","modified_gmt":"2026-02-04T13:52:30","slug":"contractor-accused-of-lack-of-transparency-at-delayed-900m-cancer-centre","status":"publish","type":"post","link":"https:\/\/www.constructionnews.co.uk\/buildings\/contractor-accused-of-lack-of-transparency-at-delayed-900m-cancer-centre-04-02-2026\/","title":{"rendered":"Contractor accused of &#8216;lack of transparency&#8217; at delayed \u00a3900m cancer centre"},"content":{"rendered":"<p>A Welsh NHS trust has warned that the construction schedule at \u00a3900m cancer centre is at risk of \u201cfurther slippage\u201d as board members accused the contractor of a lack of transparency.<\/p>\n<p>Velindre University NHS Trust said the work programme on the \u00a3\u00a3321m Velindre Cancer Centre (VCC) in Cardiff could face further delays, three-and-a-half years after a contractor was first appointed to the job.<\/p>\n<p>The project is being delivered by the Acorn consortium under a contract to finance, design, build and maintain the new building.<\/p>\n<p>The consortium is made up of <a href=\"https:\/\/www.constructionnews.co.uk\/contractors\/kier\/kier-confirmed-for-fm-on-welsh-cancer-hospital-12-04-2024\/\">28 members,<\/a> including Spanish multinational construction firm Sacyr, investor Kajima Partnerships, asset manager Abrdn, and Kier Facilities Services.<\/p>\n<p>Minutes of the trust\u2019s November VCC scrutiny sub-committee, which have just been published, show members are becoming increasingly concerned that a push to recoup lost time could lead to a \u201closs of quality\u201d in the build project and have warned construction is behind schedule.<\/p>\n<p>Key construction milestones, such as the ground floor slab, were completed 53 days late, the board heard The prefabricated external walls (facades)<br \/>\nwere also late, the minutes said.<\/p>\n<p>The minutes said: &#8220;The contractor has issued three versions of the programme, each showing further delays, and the ability to recover time is diminishing as the project progresses.<\/p>\n<p>The trust also said \u201ctransparency\u201d with the contractor is an issue.<\/p>\n<p>\u201cThe sub-committee expressed frustration over the contractor\u2019s lack of transparency and reluctance to share problems early,\u201d the minutes stated.<\/p>\n<p>Mark Trumper, the trust\u2019s senior responsible owner, said recent meetings had been held with the contractor to improve \u201copenness and collaboration, noting cultural differences and the need for relationship-building\u201d.<\/p>\n<p>The trust agreed the following action will be taken going forward: \u201cClearer narrative to be provided in future reports to explain the risks and mitigation actions, as well as regular updates on the contractor relationship and progress at future meetings.\u201d<\/p>\n<p>In 2024, the costs for the project drastically increased from <a href=\"https:\/\/www.constructionnews.co.uk\/buildings\/welsh-cancer-centre-cost-up-by-300m-as-contract-confirmed-10-06-2024\/\">\u00a3562m<\/a> to \u00a3884.8m.<\/p>\n<p>According to its website, the trust first suggested a cost of \u00a3240m back in 2010.<\/p>\n<p>The new medical building will replace the current Velindre Cancer Centre, which was built in 1956, with a 32,000 square metre treatment and research facility. It is scheduled to open in 2027.<\/p>\n<p>A statement from Velindre University NHS Trust said:\u00a0\u201cThe safety and quality of the new Velindre Cancer Centre are paramount.<\/p>\n<p>\u201cWhere quality concerns have arisen, they have been actively managed through the contractual and technical assurance processes, including via a third-party independent tester, that exist for precisely this purpose.<\/p>\n<p>\u201cAt no stage have the issues identified compromised the structural safety of the building.<\/p>\n<p>\u201cThe contractor has provided revised programmes and is implementing mitigation measures to recover time wherever possible.<\/p>\n<p>\u201cOur priority is delivering a state-of-the-art cancer centre that will deliver better outcomes through world-class cancer treatment, enhanced diagnostic capability and greater access to innovation, training and research.<\/p>\n<p>&#8220;The new Velindre Cancer Centre will open in spring 2027.&#8221;<\/p>\n<p><span data-teams=\"true\"><em>CN<\/em> approached Sacyr, which leads the consortium, for comment.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A Welsh NHS trust has warned that the construction schedule at \u00a3900m cancer centre is at risk of \u201cfurther slippage\u201d as board members accused the contractor of a lack of transparency. Velindre University NHS Trust said the work programme on the \u00a3\u00a3321m Velindre Cancer Centre (VCC) in Cardiff could face further delays, three-and-a-half years after &#8230;<\/p>\n","protected":false},"author":90643,"featured_media":500582,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ep_exclude_from_search":false,"footnotes":""},"categories":[547],"tags":[],"class_list":["post-537449","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-buildings","issue-online-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.7 (Yoast SEO v26.7) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Contractor accused of &#039;lack of transparency&#039; at delayed \u00a3900m cancer centre | Construction News<\/title>\n<meta name=\"description\" content=\"A Welsh NHS trust has warned that the construction schedule at \u00a3900m cancer centre is at risk of \u201cfurther slippage\u201d as board members accused the\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionnews.co.uk\/buildings\/contractor-accused-of-lack-of-transparency-at-delayed-900m-cancer-centre-04-02-2026\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Contractor accused of &#039;lack of transparency&#039; at delayed \u00a3900m cancer centre\" \/>\n<meta property=\"og:description\" content=\"A Welsh NHS trust has warned that the construction schedule at \u00a3900m cancer centre is at risk of \u201cfurther slippage\u201d as board members accused the\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionnews.co.uk\/buildings\/contractor-accused-of-lack-of-transparency-at-delayed-900m-cancer-centre-04-02-2026\/\" \/>\n<meta property=\"og:site_name\" content=\"Construction News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/CN.community\" \/>\n<meta property=\"article:published_time\" content=\"2026-02-04T12:45:18+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-02-04T13:52:30+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2024\/06\/Velindre-cancer-centre_2.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"620\" \/>\n\t<meta property=\"og:image:height\" content=\"414\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Joshua Stein\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@CNplus\" \/>\n<meta name=\"twitter:site\" content=\"@CNplus\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Joshua Stein\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/buildings\/contractor-accused-of-lack-of-transparency-at-delayed-900m-cancer-centre-04-02-2026\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/buildings\/contractor-accused-of-lack-of-transparency-at-delayed-900m-cancer-centre-04-02-2026\/\"},\"author\":{\"name\":\"Joshua Stein\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/482eae6a8521cf09396402a7e955effc\"},\"headline\":\"Contractor accused of &#8216;lack of transparency&#8217; at delayed \u00a3900m cancer centre\",\"datePublished\":\"2026-02-04T12:45:18+00:00\",\"dateModified\":\"2026-02-04T13:52:30+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/buildings\/contractor-accused-of-lack-of-transparency-at-delayed-900m-cancer-centre-04-02-2026\/\"},\"wordCount\":499,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/buildings\/contractor-accused-of-lack-of-transparency-at-delayed-900m-cancer-centre-04-02-2026\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2024\/06\/Velindre-cancer-centre_2.jpg\",\"articleSection\":[\"Buildings\"],\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.constructionnews.co.uk\/buildings\/contractor-accused-of-lack-of-transparency-at-delayed-900m-cancer-centre-04-02-2026\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/buildings\/contractor-accused-of-lack-of-transparency-at-delayed-900m-cancer-centre-04-02-2026\/\",\"url\":\"https:\/\/www.constructionnews.co.uk\/buildings\/contractor-accused-of-lack-of-transparency-at-delayed-900m-cancer-centre-04-02-2026\/\",\"name\":\"Contractor accused of 'lack of transparency' at delayed \u00a3900m cancer centre | Construction News\",\"isPartOf\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/buildings\/contractor-accused-of-lack-of-transparency-at-delayed-900m-cancer-centre-04-02-2026\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/buildings\/contractor-accused-of-lack-of-transparency-at-delayed-900m-cancer-centre-04-02-2026\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2024\/06\/Velindre-cancer-centre_2.jpg\",\"datePublished\":\"2026-02-04T12:45:18+00:00\",\"dateModified\":\"2026-02-04T13:52:30+00:00\",\"author\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/482eae6a8521cf09396402a7e955effc\"},\"description\":\"A Welsh NHS trust has warned that the construction schedule at \u00a3900m cancer centre is at risk of \u201cfurther slippage\u201d as board members accused the\",\"breadcrumb\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/buildings\/contractor-accused-of-lack-of-transparency-at-delayed-900m-cancer-centre-04-02-2026\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.constructionnews.co.uk\/buildings\/contractor-accused-of-lack-of-transparency-at-delayed-900m-cancer-centre-04-02-2026\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/buildings\/contractor-accused-of-lack-of-transparency-at-delayed-900m-cancer-centre-04-02-2026\/#primaryimage\",\"url\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2024\/06\/Velindre-cancer-centre_2.jpg\",\"contentUrl\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2024\/06\/Velindre-cancer-centre_2.jpg\",\"width\":1024,\"height\":683},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/buildings\/contractor-accused-of-lack-of-transparency-at-delayed-900m-cancer-centre-04-02-2026\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.constructionnews.co.uk\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Contractor accused of &#8216;lack of transparency&#8217; at delayed \u00a3900m cancer centre\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#website\",\"url\":\"https:\/\/www.constructionnews.co.uk\/\",\"name\":\"Construction News\",\"description\":\"Read UK Construction Industry News, Analysis, Opinion and data\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.constructionnews.co.uk\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/482eae6a8521cf09396402a7e955effc\",\"name\":\"Joshua Stein\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/image\/09661283414c6a1a39b5867f8375fd1a\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/389df7f699e66c778382dc9b75d0d431e05c3bcf365a0418b8e7901b77e40c4b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/389df7f699e66c778382dc9b75d0d431e05c3bcf365a0418b8e7901b77e40c4b?s=96&d=mm&r=g\",\"caption\":\"Joshua Stein\"},\"url\":\"https:\/\/www.constructionnews.co.uk\/author\/joshua-stein\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Contractor accused of 'lack of transparency' at delayed \u00a3900m cancer centre | Construction News","description":"A Welsh NHS trust has warned that the construction schedule at \u00a3900m cancer centre is at risk of \u201cfurther slippage\u201d as board members accused the","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionnews.co.uk\/buildings\/contractor-accused-of-lack-of-transparency-at-delayed-900m-cancer-centre-04-02-2026\/","og_locale":"en_GB","og_type":"article","og_title":"Contractor accused of 'lack of transparency' at delayed \u00a3900m cancer centre","og_description":"A Welsh NHS trust has warned that the construction schedule at \u00a3900m cancer centre is at risk of \u201cfurther slippage\u201d as board members accused the","og_url":"https:\/\/www.constructionnews.co.uk\/buildings\/contractor-accused-of-lack-of-transparency-at-delayed-900m-cancer-centre-04-02-2026\/","og_site_name":"Construction News","article_publisher":"https:\/\/www.facebook.com\/CN.community","article_published_time":"2026-02-04T12:45:18+00:00","article_modified_time":"2026-02-04T13:52:30+00:00","og_image":[{"url":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2024\/06\/Velindre-cancer-centre_2.jpg","width":620,"height":414,"type":"image\/jpeg"}],"author":"Joshua Stein","twitter_card":"summary_large_image","twitter_creator":"@CNplus","twitter_site":"@CNplus","twitter_misc":{"Written by":"Joshua Stein","Estimated reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionnews.co.uk\/buildings\/contractor-accused-of-lack-of-transparency-at-delayed-900m-cancer-centre-04-02-2026\/#article","isPartOf":{"@id":"https:\/\/www.constructionnews.co.uk\/buildings\/contractor-accused-of-lack-of-transparency-at-delayed-900m-cancer-centre-04-02-2026\/"},"author":{"name":"Joshua Stein","@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/482eae6a8521cf09396402a7e955effc"},"headline":"Contractor accused of &#8216;lack of transparency&#8217; at delayed \u00a3900m cancer centre","datePublished":"2026-02-04T12:45:18+00:00","dateModified":"2026-02-04T13:52:30+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionnews.co.uk\/buildings\/contractor-accused-of-lack-of-transparency-at-delayed-900m-cancer-centre-04-02-2026\/"},"wordCount":499,"commentCount":0,"image":{"@id":"https:\/\/www.constructionnews.co.uk\/buildings\/contractor-accused-of-lack-of-transparency-at-delayed-900m-cancer-centre-04-02-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2024\/06\/Velindre-cancer-centre_2.jpg","articleSection":["Buildings"],"inLanguage":"en-GB","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionnews.co.uk\/buildings\/contractor-accused-of-lack-of-transparency-at-delayed-900m-cancer-centre-04-02-2026\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionnews.co.uk\/buildings\/contractor-accused-of-lack-of-transparency-at-delayed-900m-cancer-centre-04-02-2026\/","url":"https:\/\/www.constructionnews.co.uk\/buildings\/contractor-accused-of-lack-of-transparency-at-delayed-900m-cancer-centre-04-02-2026\/","name":"Contractor accused of 'lack of transparency' at delayed \u00a3900m cancer centre | Construction News","isPartOf":{"@id":"https:\/\/www.constructionnews.co.uk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionnews.co.uk\/buildings\/contractor-accused-of-lack-of-transparency-at-delayed-900m-cancer-centre-04-02-2026\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionnews.co.uk\/buildings\/contractor-accused-of-lack-of-transparency-at-delayed-900m-cancer-centre-04-02-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2024\/06\/Velindre-cancer-centre_2.jpg","datePublished":"2026-02-04T12:45:18+00:00","dateModified":"2026-02-04T13:52:30+00:00","author":{"@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/482eae6a8521cf09396402a7e955effc"},"description":"A Welsh NHS trust has warned that the construction schedule at \u00a3900m cancer centre is at risk of \u201cfurther slippage\u201d as board members accused the","breadcrumb":{"@id":"https:\/\/www.constructionnews.co.uk\/buildings\/contractor-accused-of-lack-of-transparency-at-delayed-900m-cancer-centre-04-02-2026\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionnews.co.uk\/buildings\/contractor-accused-of-lack-of-transparency-at-delayed-900m-cancer-centre-04-02-2026\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.constructionnews.co.uk\/buildings\/contractor-accused-of-lack-of-transparency-at-delayed-900m-cancer-centre-04-02-2026\/#primaryimage","url":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2024\/06\/Velindre-cancer-centre_2.jpg","contentUrl":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2024\/06\/Velindre-cancer-centre_2.jpg","width":1024,"height":683},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionnews.co.uk\/buildings\/contractor-accused-of-lack-of-transparency-at-delayed-900m-cancer-centre-04-02-2026\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionnews.co.uk\/"},{"@type":"ListItem","position":2,"name":"Contractor accused of &#8216;lack of transparency&#8217; at delayed \u00a3900m cancer centre"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionnews.co.uk\/#website","url":"https:\/\/www.constructionnews.co.uk\/","name":"Construction News","description":"Read UK Construction Industry News, Analysis, Opinion and data","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionnews.co.uk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/482eae6a8521cf09396402a7e955effc","name":"Joshua Stein","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/image\/09661283414c6a1a39b5867f8375fd1a","url":"https:\/\/secure.gravatar.com\/avatar\/389df7f699e66c778382dc9b75d0d431e05c3bcf365a0418b8e7901b77e40c4b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/389df7f699e66c778382dc9b75d0d431e05c3bcf365a0418b8e7901b77e40c4b?s=96&d=mm&r=g","caption":"Joshua Stein"},"url":"https:\/\/www.constructionnews.co.uk\/author\/joshua-stein\/"}]}},"_links":{"self":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/537449","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/users\/90643"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/comments?post=537449"}],"version-history":[{"count":20,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/537449\/revisions"}],"predecessor-version":[{"id":537555,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/537449\/revisions\/537555"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/media\/500582"}],"wp:attachment":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/media?parent=537449"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/categories?post=537449"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/tags?post=537449"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}